- West Coast Expressway
Malaysian expressway routebox
Highway concessionaire's
Konsortium Lebuhraya Pantai Barat (KPLB) Sdn Bhd
E-- = MES-E|28
E28
length-km = --
direction =North ↔South
start =Taiping ,Perak
destinations =Beruas Ayer Tawar Kampung Gajah Teluk Intan Sabak Bernam Tanjung Karang Kuala Selangor Kapar Bukit Raja Klang Teluk Panglima Garang Banting Kuala Lumpur International Airport (KLIA)
end =Banting ,Selangor
starting-date =2008
completion-date =2013
interchanges = JKR|1 Federal route 1
MES-E|1 AHN-AH|2North-South Expressway Northern Route
JKR|60 Federal route 60
JKR|5 Federal route 5
JKR|5Ipoh-Lumut Highway
JKR|58 Federal route 58
MES-E|25Assam Jawa-Templer Park Highway
JKR|20 MES-E|30North Klang Straits Bypass
JKR|2 Federal Highway
MES-E|5Shah Alam Expressway
MES-E|26South Klang Valley Expressway
JKR|B18Jalan Banting-Dengkil
JKR|B20Nilai-KLIA Highway
Asian Highway Network = none
Development Cost= RM3.12b
Number of lanes= 4 lanes
Interchanges= -
Toll plazas= -
Layby= -
Rest and Service Area= -
Overhead Bridge Restaurant= -
Vista Point= -
Highway tunnels= -
Type of roads= -
Toll systems= Closed toll systemsThe West Coast Expressway, WCE or (
Malay : "Lebuhraya Pantai Barat") (LPB), MES-E|28 is a planned expressway that will be built on the west coast ofPeninsula Malaysia . It will connectTaiping ,Perak toBanting inSelangor . The expressway will be built by Konsortium Lebuhraya Pantai Barat (KLPB) soon, as approval has just been given by the government for the construction to begin.Overview
Construction of the expressway will be divided into 2 phases. Phase 1 involves the stretch between
Tanjung Karang andBanting where construction will begin in June 2008 and completed by 2011. Phase 2 involves the stretch betweenTaiping andSabak Bernam where construction will begin in 2010 and completed by 2013. The stretch betweenSabak Bernam andTanjung Karang will be on the existing stretch of Federal route JKR|5 which will be upgraded as part of the expressway. The expressway will have a closed toll system like North-South Expressway.The highway will cost about RM 4.6 billion, where RM3.6 billion will be construction costs. The concessionaire company is planning to issue bonds in 2009. Construction has been delayed to 2009 because of changes in alignment and costing. It is expected to complete in 2012. [cite news|title= Europlus plans RM3b bond sale to fund road project| url= http://www.btimes.com.my/Current_News/BTIMES/Wednesday/Frontpage/europlas-2.xml/Article/| author=Rupinder Singh | publisher=Business Times| date=2008-07-30]
List of Interchanges (To be finalized when information is available)