- Bangalore Water Supply and Sewerage Board
The Bangalore Water Supply and Sewerage Board (BWSSB) is the premier governmental agency responsible for
sewage disposal and water supply to theIndia n city ofBangalore . It was formed in 1968. [ [http://indiagovernance.gov.in/GKC/GKC_WebUI/Portal/TaxonomyShowCase/ShowCaseStudy.aspx?CSID=366&tid=351 "e-Governance in Bangalore Water Supply & Sewerage Board", India Governance Knowledge Center, accessedAugust 11 2007] . Note that other sources indicate 1964 as the year of the Board's formation.]Water supply
BWSSB currently supplies approximately 900 million litres (238 million gallons) of water to the city per day, despite a municipal demand of 1.3 billion liters. Water for India's third largest city (with a population of about 6.5 million) comes from a number of sources, with 80% of it coming from the Cauvery River. Water is also drawn from the
Arkavathy River , but the supply does not meet the demand. [http://www.bwssb.org/help_faq.html BWSSB web site FAQ] ]The "per capita" water supply that BWSSB is able to provide averages 100 to 125 liters per capital per day. However, the actual availability of water to the poor areas of the city is limited by infrastructure, and so for these areas, the "per capita" supply can be as low as 40 to 45 liters per day. The "per capita" national standard for a city the size of Bangalore is 150 to 200 liters per day,
Cauvery River project
The majority of the water for Bangalore is imported by the BWSSB from the Cauvery River, over 100 kilometers (62 miles) south of the city. [http://www.tce.co.in/infra/watersupply/bangalore.pdf "Cauvery Water Supply Scheme - Stage IV: Phase I Design Review Report overview", TCE Consulting Engineers Limited, accessed
August 11 2007] ] Cauvery water was originally drawn from a reservoir near the village ofThorekadanahalli . To meet the increasing demand, the "Cauvery Water Supply Scheme" was undertaken by the BWSSB, with Stages I - III completed. Stage IV is currently being built, with Phase I completed and bringing an additional 270 million liters to the city. [http://www.hindu.com/2007/06/20/stories/2007062074520400.htm "Cauvery water for new areas soon", "The Hindu",June 20 2007, accessedAugust 11 2007 ] ] . Construction of Stage IV: Phase II is expected to bring an additional 510 million liters, and will be completed by 2010.The energy required to transport the water this distance consumes 75% of the agency's revenues. [http://www.hindu.com/2007/08/03/stories/2007080360510500.htm "Bangalore team visits RWH structures in city", "The Hindu",
August 3 2007, accessedAugust 11 2007 ] ]Arkavathy River
Up to 20% of the normal water supply for Bangalore comes from the Arkavathy River, from two reservoirs built on the river, the
Hesaraghatta (or Hesseraggatta) which was built in 1894 and theTippagondanahalli Reservoir (or T G Halli), which was built in 1933.In June, 2007, T G Halli, from which BWSSB pumped 35 million litres per day into the western parts of the city, had effectively gone dry due to lack of rainfall over its watershed. BWSSB officials stated that they would address the issue initially by making water available for only one hour a day, and then by diverting water from other parts of the city, as well as bringing water in by truck. [http://www.deccanherald.com/Content/Jun272007/city200706279672.asp "It pours, but T G Halli reservoir remains dry", "Deccan Herald",
June 27 2007, accessedAugust 11 2007 ] ] The quality of the water in the reservoir has also become compromised by the discharge ofeffluent into the reservoir. [ [http://kspcb.kar.nic.in/Tippagondanahalli%20Reservoir.doc Government of Karnataka Notification No. FEE 215 ENV 2000] ]Rainwater harvesting
To further address water supply issues, BWSSB has studied the
rainwater harvesting (RWH) techniques used inChennai , where such methods have greatly reduced water shortage issues. RWH methods are becoming mandatory in Bangalore. In addition, in April 2007, BWSSB issued a moratorium on new building hookups to the water system. [http://www.hindu.com/2007/06/03/stories/2007060308500400.htm "Rainwater harvesting is the way forward for Bangalore","The Hindu"June 3 2007 , accessedAugust 11 2007 ] ] The moratorium was lifted in July, but only on new buildings that have a RWH system installed. [http://www.deccanherald.com/Content/Jul12007/city2007070110428.asp "Ban on New Water Connection Goes", "Deccan Herald",July 1 2007, accessedAugust 11 2007 ] ]Water rationing
The BWSSB is also considering implementing a mandatory water rationing program in order to evenly distribute what water supplies exist. A small trial rationing program was instituted in March, 2007 with electronic water meters which would shut off after the allotted amount of water was used, but the program was considered a technical failure, due in part to software issues. [http://www.thehindu.com/2007/06/27/stories/2007062756150300.htm "Water rationing looms large over Bangalore city", "The Hindu",
June 27 2007] ]Water table issues
Groundwater extraction to meet the high demands of has cause the
water table to drop variously from 90 to 300 meters (300 to 1000 feet) below ground level (as compared to an average water table depth of about 30 meters (90 feet) two decades ago, according to theIndian Institute of Science . [http://www.thehindu.com/2007/06/28/stories/2007062860351300.htm "Water access and citizens’ movements", "The Hindu",June 28 2007] ]The situation affecting T G Halli are not isolated. Rapid urbanization in and around Bangalore has destroyed many wetlands areas (of the 51 lakes in the city in 1973, only 17 remain in 2007), which has also contributed to the decrease in the water table.
ewerage system
Bangalore's original sewerage system was built in 1922, a time when the city was much smaller than it is today; the original system served only the heart of the city. In 1950, with the city greatly expanding, a project was initiated to greatly expand the sewerage system. After the BWSSB was formed in the 1960s, programs were again implemented to expand the system to unsewered areas. The current sewer system utilizes stoneware pipes up to convert|300|mm|in|1 in diameter, and RCC hume pipes for the mains and outfalls up to convert|2100|mm|in|1 in diameter. [ [http://www.bwssb.org/sewerage_system.html BWSSB Sewerage System overview] ]
There are three main sewage treatment plants, which are located in the Vrishabavathy,
Koramangala -Chellaghatta andHebbal valleys. Two additional mini-plants have been built nearMadiwala and Kempambudi.Pollution issues
Despite the current efforts to enlarge the sewerage system, in a number of areas of the city untreated sewage is simply discharged into the
Thenpennaiar River , which has caused theKrishnagiri Reservoir to become heavily polluted, affecting the drinking water quality in town ofKrishnagiri and surrounding villages. [http://www.thehindu.com/2007/06/26/stories/2007062653940300.htm "Supply of contaminated water continues in Krishnagiri", "The Hindu",June 26 2007, accessedAugust 11 2007 ] ]ee also
*
Infrastructure in Bangalore
*Kaveri River Water Dispute
*Sanitary sewer overflow References
External links
* [http://www.bwssb.org Official agency website]
* [http://www.onlinebangalore.com/gove/bwss/banwater.html BWSSB info on Bangalore' government web site]
* [http://newsrack.in/Browse.do;jsessionid=45425803EFFD9C4C48B99421432BCE28?owner=sas&issue=Bangalore+water+supply&catID=9&start=21 Archive of news stories about BWSSB]
Wikimedia Foundation. 2010.