- International Railway Bridge
Infobox_Bridge
bridge_name= International Railway Bridge
caption=
official_name=
also_known_as=
carries= Rail Traffic
crosses=Niagara River
locale=Fort Erie, Ontario andBuffalo, New York
maint=
id=
design=
mainspan= Main Channel convert|1890|ft|m|0 - Black Rock Channel convert|440|ft|m|0
length=
width=
clearance= convert|22|ft|m|0
below=
traffic=
open=November 3 1873
closed=
toll=
map_cue=
map_
map_text=
map_width=
lat=
long=The International Railway Bridge carries a railway line across the
Niagara River betweenFort Erie, Ontario andBuffalo, New York . It was built in1873 for the International Bridge Company byCasimir Stanislaus Gzowski and D.L. MacPherson. [http://www.niagarafrontier.com/bridges.html#b16 International Railway Bridge] ]The bridge consists of two sections, the first extending from the Canadian shore to Squaw Island, NY, and the second extending from Squaw Island to the American mainland shore. The portion between these was originally built on a trestle, but was filled to form an embankment soon after the bridge opened. Citation | title = The International Bridge - Progress and Character of the Work - The Roads to Cross It | newspaper = The New York Times | date =
1873-08-18 ]The need for a bridge
Before bridges crossed the Upper Niagara River, it was crossed by several ferries running between Fort Erie and Buffalo. As well as being a serious bottleneck to both freight and passenger traffic, this crossing was often dangerous as the current in this area is swift, and ice is a problem several months of the year.
Proposals for a bridge surface by
1856 , raising concerns about the effect to navigation rights on the river. Citation | title = Bridging the Niagara | newspaper = The New York Times | date =1856-12-27 ] By 1857, theGrand Trunk Railway had also proposed the crossing. The Dominion of Canada and the New York State Legislature drafted an agreement for construction of the bridge. Engineering surveys and fundraising took place over the next several years.Construction of the bridge was recognized as a major technological challenge. The Niagara River in this area is up to convert|45|ft|m|0 deep and flows at up to convert|12|mph|abbr=on|lk=on. It is also located at the east end of
Lake Erie , and during the spring, large blocks of ice often flow down the river, threatening to destroy any bridge placed in its path. Citation | title = The International Bridge | newspaper = The New York Times | date =1873-11-05 ] There are also major financial challenges in a project such as this. Accordingly, some years were required to overcome these obstacles. Additionally, in the 1860s, theAmerican Civil War , and rebuilding afterwards, consumed much of the resources of the United States and further delayed construction. It is noted though that planning did not stop altogether, even during the war. A meeting of the Commissioners of the company took place on April 5, 1864. [ Citation | title = Another International Bridge | newspaper = The New York Times | date =1864-04-06 ]On May 18, 1870, The American and Dominion International Bridge Companies met to merge into one corporation for the purpose of building this bridge. A contract for the construction of the bridge was concluded with C. S. Gzowski & Co. Citation | title = The American and Colonial International Bridge Companies | newspaper = The New York Times | date =
1870-05-19 ] It was stated that the bridge should be completed by the end of 1871.Construction
Prior to the construction of the eight stone piers, it was necessary to remove up to ten feet (three meters) of gravel from the bottom of the river. The piers were constructed from stone quarried at various locations on the Canadian side. Each pier was both pointed and sloped on the upstream side to most effectively break up ice flows. The iron for the bridge was manufactured at
Phoenixville, Pennsylvania . Each of the 12 Pratt Truss spans was constructed on floating pontoons between the piers. Upon completion, the pontoons were filled with water to lower the bridge span precisely into place on the piers.The bridge was constructed with two swing spans. One was located on the American side of the main channel of the river and provided a navigable opening of convert|160|ft|m|0 width. The second was located over Black Rock Harbor and provided a navigable opening of convert|90|ft|m|0 width. Both were operated by steam and could open or close in approximately fifty seconds. The portion of the bridge from Squaw Island to the US Mainland was constructed for two tracks. The longer portion from Squaw Island to Canada was built as only a single track. Both sections had a common sidewalk on one side.
The bridge was opened November 3, 1873, almost two years after the date originally evisioned. Construction cost $1.5 million. It was constructed without the loss of any lives, which was most uncommon for a major construction project in that era.
Bridge operations and changes
Before the opening day of the bridge, many railroads had already constructed tracks to its location. The Grand Trunk, Great Western,
Canada Southern Railway , Erie, New York Central and New York, West Shore and Chicago were all prepared to begin using the bridge soon after opening day. There were conflicts between the various companies using the bridge, including one where the Canada Southern Railway filed suit over the excessive rate of $1 charged for each rail car it carried over the bridge. [ Citation | title = The Niagara Bridge Case | newspaper = The New York Times | date =1880-12-28 ] Such conflicts are not unexpected when several competing railway companies use a single track.The bridge was modified in 1900, during which time the pedestrian walkway was removed from the main span, The bridge's busiest day ever was July 10, 1916, when 264 trains crossed.
The swing bridge in the main channel ceased to open at some time between 1941 and 1944 (it appears on the US War Department chart 312 in February 1941, but not on the same chart in March 1944, or any time thereafter). cite web|url = http://historicals.ncd.noaa.gov/historicals/histmap.asp | title = Historic Map and Chart Project - Image Catalog | acctssdate =
2007-11-25 ] The swing span between Squaw Island and the American mainland continues to swing today. This portion of the bridge was built for two tracks, but currently carries only one. It also carries a road on one side, and a bicycle trail on the other side. This span also crosses over theNew York State Thruway (I190).Operations on the bridge were suddenly suspended in February, 1993 due to problems with some of the stone piers. Canadian National spent $2 million to refurbish these and get the bridge back into operation.
The bridge today
The bridge is now part of the
Canadian National Railway Stamford Subdivision. It is also used by theCanadian Pacific Railway . The bridge has seen an increase in traffic since the Canadian Pacific abandoned its route viaNiagara Falls, Ontario and re-routed across this bridge in late 2001. Fifteen trains per day is now typical and often trains are seen at or near a stop on the bridge undergoing various security checks to cross the international border. The bridge no longer carries any passenger trains.References
Crossings navbox
structure = Bridges
place =Niagara River
bridge = International Railway Bridge
bridge signs =
upstream =Peace Bridge
upstream signs =
downstream =South Grand Island Bridge
downstream signs =