- Townsville Ring Road
The Townsville Ring Road, is the future A1/M1 (
Bruce Highway ) Route that will eventually bypass the inner metro area of Townsville, Australia. The road will be built in 4 stages with the first three stages built as a two-lanedmotorway . The First Stage, TheDouglas Arterial Road , opened in April 2005. [http://www.mainroads.qld.gov.au/MRWEB/Prod/Content.nsf/DOCINDEX/Hervey+Range+Road?OpenDocument| Mainroads info page 1] ] The fourth stage involves four laning of the first three stages of the project and an additional four-lane link between the third stage to the Bruce Highway to the north-west ofTownsville .tage Two and Three
On the
24th October ,2006 , Surveying for theHervey's Range Road Interchange had started, with construction on the interchange commencing during April 2007. Completion on the next two stages of the project is expected for mid/late-2008. Once these stages are complete, the road will officially be designated as the (A1) or National Highway 1 at the moment of opening, and in the long-term (after 2015), after duplication of the entire project (including construction of the Bohle plains Extension), the road will be designated as the M1. [ [http://www.mainroads.qld.gov.au/MRWEB/PROD/Content.nsf/DOCINDEX/The+Ring+Road+Sections+2+and+3+(Shaw+Road+and+Condon+Sections)?OpenDocument| Mainroads info page 2] ]Stages two and three are ahead of schedule and is expected to be complete by the 31st of December, 2008.
Stages of the Ring Road
Completed
*Douglas Arterial Road
**- 2-lane Road
**- Single Carriageway Motorway Standard
**- 100km/h speed limit. [ [http://www.mainroads.qld.gov.au/MRWEB/PROD/Content.nsf/2911b5cc11cfec994a2569e60005f0b3/e536f247def78cb44a257037007aa177?OpenDocument| Mainroads project page] ]Under Construction
* Condon Bypass (construction on track for late 2006 - late 2008)
**- 2-lane Road
**- Single Carriageway Motorway Standard
**- 100km/h speed limit. [ [http://www.mainroads.qld.gov.au/MRWEB/PROD/Content.nsf/DOCINDEX/The+Ring+Road+Sections+2+and+3+(Shaw+Road+and+Condon+Sections)?OpenDocument| Mainroads Ringroad Sections 2 and 3] ]* Shaws Road Extension (construction on track for late 2006 - late 2008)
**- 2-lane Road
**- Single Carriageway Motorway Standard
**- 100km/h speed limit. [ [http://www.mainroads.qld.gov.au/MRWEB/PROD/Content.nsf/DOCINDEX/The+Ring+Road+Sections+2+and+3+(Shaw+Road+and+Condon+Sections)?OpenDocument| Mainroads Page] ]Proposed
* Bohle Plains Extension, plus duplication ofDouglas Arterial Road and other 2 stages (construction planned for 2011 or 2015)
**- 4-Lane Motorway Road (Specific section)
**- Duplication of the first three stages to 4-lane Motorway
**- 100km/h speed limit. [ [http://www.mainroads.qld.gov.au/MRWEB/PROD/Content.nsf/DOCINDEX/The+Ring+Road+Sections+2+and+3+(Shaw+Road+and+Condon+Sections)?OpenDocument| Mainroads Ringroad site] ]References
External links
* [http://www.mainroads.qld.gov.au/MRWEB/PROD/Content.nsf/DOCINDEX/The+Ring+Road+Sections+2+and+3+(Shaw+Road+and+Condon+Sections)?OpenDocument| Ring Road Project site]