- Damansara-Puchong Expressway
Malaysian_expressway_routebox
E--=MES-E|11
E11
Highway concessionaire's logo=
Lingkaran Trans Kota Holdings Bhd
(Litrak)
length-km=40
direction=North -South
start=Sri Damansara Interchange
destinations=Bukit Lanjan Mutiara Damansara Bandar Utama Taman Tun Dr Ismail Kelana Jaya Bandar Sunway Petaling Jaya Puchong Sungai Besi Subang Jaya Shah Alam Putrajaya Cyberjaya
end= Serdang Interchange
starting-date=1997
completion-date=1999
interchanges= JKR|54Sungai Buloh Highway
JKR|28Kuala Lumpur Middle Ring Road 2
MES-E|23Sprint Expressway = Penchala Link and Damansara LinkMajlis Link
JKR|2Federal Highway
MES-E|5Shah Alam Expressway
JKR|B11Jalan Puchong-Petaling Jaya
JKR|217Puchong-Sungai Besi Highway
JKR|15Subang Airport-Kewajipan Highway
JKR|3214Shah Alam-Puchong Highway
MES-E|29Putrajaya-Cyberjaya Expressway
Asian Highway Network=none
Development Cost=
Number of lanes=6 lanes
Interchanges=12
Toll plazas=4
Layby=5
Rest and Service Area=none
Overhead Bridge Restaurant=none
Vista Point=none
Highway tunnels=1
"(Damansara Utama tunnel at Damansara Utama Interchange)"
Type of roads=Tarmac
Toll systems=Open toll systemThe Damansara-Puchong Expressway or Lebuhraya Damansara-Puchong, LDP, MES-E|11 is a major expressway in
Klang Valley ,Selangor inMalaysia . It links major townships inDamansara andPuchong and decreases travel time between them. Besides that, the expressway provides better accessibility to these areas via links to other expressways in Klang Valley, such as JKR|2 Federal Highway, JKR|217Puchong-Sungai Besi Highway , MES-E|10New Pantai Expressway (NPE), MES-E|23Sprint Expressway , JKR|54Sungai Buloh Highway , and JKR|28Kuala Lumpur Middle Ring Road 2 (MRR2).History and pioneer routes
Construction of the expressway began in
1997 . The expressway is formally known as Jalan Sungai Penchala, Jalan Perbandaran, Jalan PJS Utama,Jalan Puchong-Petaling Jaya JKR|B11, Jalan Puchong-Shah Alam JKR|B7, Jalan Puchong Perdana, and Jalan Puchong-Sri Kembangan JKR|B16. The Damansara-Puchong Expressway was opened in1999 .Since
1 July 2004 , the FasTrak electronic payment system has been replaced byTouch 'n Go andSmart TAG electronic payment system s.Features
A notable feature of the expressway is a cable-stayed bridge on the Federal Highway interchange.
Current developments
Upgrading of the Puchong Jaya Interchange
The upgrading works of the
Puchong Jaya Interchange including ramp fromPuchong-Sungai Besi Highway to the expressway began in 2002 and was completed in 2005.Construction of the Kelana Jaya Interchange and the Kampung Baru Puchong Interchange
Construction of the elevated U-Turn at Puchong
Upgrading of the TTDI Interchange
The upgrading of the TTDI interchange began on November 2007.
Toll rates
(Starting
1 January 2007 )References
* [http://www.arup.com.my/ Arup Juruunding Sdn. Bhd]
External links
* [http://www.gamuda.com.my Gamuda Group]
* [http://www.litrak.com.my LITRAK]See also
*
Malaysian expressway system
Wikimedia Foundation. 2010.