- Tren Urbano
Infobox Public transit
name = Tren Urbano
imagesize = 100px
locale = San JuanGuaynabo Bayamón
transit_type =Rapid transit
began_operation =December 17 ,2004
system_length = 10.7 mi (17.2 km)
lines = 1
stations = 16
vehicles = 74
ridership = 40,000 (avg. weekday)
projected = 100,000 (daily)
short of projection = 63%
track_gauge =
operator = Department of Transportation (DTOP),Siemens The Tren Urbano — or Urban Train in English — is a 10.7 mile (17.2 km) fully automatedrapid transit that serves the metropolitan area of San Juan,Puerto Rico , which includes the municipalities of San Juan, Bayamón, and Guaynabo. It is electrified by third rail at 750 V, d.c. As of 2007, the Tren Urbano consists of 16 stations on a single line.The Tren Urbano complements other forms of public transportation on the island such as the public bus system,
taxi s, water ferries and shuttles. The entire mass transportation system has been dubbed the “Alternativa de Transporte Integrado” (Integrated Transportation Alternative) or “ATI”.Tren Urbano is the Caribbean's first rapid transit system [ [http://www.railway-technology.com/projects/tren/ Puerto Rican capital of San Juan will have the first rapid transit system in the Caribbean] ] .
History
In the late 19th century while the island was under Spanish rule,
regional rail systems started to be built inPuerto Rico . Therailroad continued to be in use for the most part of the first half of the 20th century and played a key role in the transportation of people and goods throughout the island. The railroad systems of the period also played a vital role in thesugarcane industry.From 1901 to 1946 San Juan had a street
tram way network (“Trolley” de San Juan) operated by the Porto Rico Railway, Light and Power Company [ [http://home.cc.umanitoba.ca/~wyatt/alltime/a2z-zz.html Canadian Transit Interests Outside Canada] ] with more than 32 km (20 miles) of tracks and ran between San Juan and Santurce. During its heyday, it was the most modern electric streetcar system in Puerto Rico, rivaling New York and Toronto and transported nearly 10 million passengers a year. Today there are plans to bring back the tram to the heart of San Juan to complement the Tren Urbano.During the 1950s, an industrial boom, due in part to development programs such as
Operation Bootstrap , led to the downfall of agriculture as the principal industry on the island. During this decade automobiles became more widely available. Newer, and more efficient roads and highways along with the closure of sugarcane mills displaced the need for rail transportation. It was not long that it was realized that an alternative means ofmass transportation was needed in addition to the public bus system to alleviate the severe traffic situation that was being created, especially in the San Juan metropolitan area.Return of rail transit
Proposals
In 1967, proposals were made for the construction of a rapid rail transit system to serve the city of San Juan. It was not until 1989 that Puerto Rico’s Department of Transportation and Public Works (DTPW, or DTOP in Spanish) officially proposed the construction of a new rail system. The train system was dubbed the “Tren Urbano”, Spanish for “Urban Train”. In 1993, the
Federal Transit Administration (FTA) selected the Tren Urbano as one of the Turnkey Demonstration Projects under the Intermodal Surface Transportation Efficiency Act of 1991. During 1996 and 1997, seven design-build contracts were awarded for different segments of the Tren Urbano Phase 1 system.
A number of companies shared the tasks for building the Tren Urbano including
Siemens AG which was granted a concession to design and build the line and its rolling stock, and to operate it for the first five years. The company won a contract which was a “first” for North America in the scope of the work which it involved, and which was awarded in July 1996.Construction
The construction project was plagued by delays, contractual disputes between the government and companies involved in the undertaking, as well as investigations into possible mismanagement of funds. The project cost was US $2.28 billion.http://www.fta.dot.gov/documents/NSPA2007_Final(1).pdf FTA -THE PREDICTED AND ACTUAL IMPACTS OF NEW STARTS PROJECTS - 2007]
Free Service
The rail system was officially inaugurated on
December 17 ,2004 . After this date, free service was offered on weekends until April, 2005 when weekdays were added to the free service. Popularity grew quickly and by the end of the free period 40,000 people were using the train on a daily basis. By late 2005, however, ridership had fallen to 24,000, less than one-third of the 80,000 projection (and well below the projection of 110,000 for 2010). [ [http://tollroadsnews.info/artman/publish/article_1161.shtml/ Tren Urbano PR another way low transit ridership forecast] , TOLLROADSNews,November 20 ,2005 , accessedApril 13 ,2007 .]Paid Service
Paid fare service started on
June 6 ,2005 . In 2006, average weekday boardings stood at 28,179 and in 2007, ridership decreased to 27,567. Ironically, the Tren Urbano goes mostly through suburban areas.Issues and Concerns
There is no service to Old San Juan, Santurce, the Airport (and many other parts of Guaynabo,Bayamón and San Juan),it doesn't serve important suburbs like
Cataño ,Toa Baja ,Toa Alta ,Carolina ,Trujillo Alto ,Canóvanas and others, which helps to explain low ridership. However, some question the viability of this system for other reasons, such as the lack of an island-wide public-transportation system.Fact|date=July 2008 At present, there is no reliable inter-city public transportation, such as buses with a regular schedule. Integration with other public mass transit systems, such as AMA, has proven to be an uphill issue for the DTOP.Customer service centers are located at the Martínez Nadal, Rio Piedras and Sagrado Corazon Stations.
Route
Tren Urbano is currently made up of one rapid transit route. It contains 16 stations, ten of which are elevated, four at grade or in open cuttings, and two underground. The stations in the system are:
*Sagrado Corazón (Sagrado Corazón)
*Hato Rey (Golden Mile /José Miguel Agrelot Coliseum )
*Roosevelt (Golden Mile)
*Domenech (Hato Rey) – ()
*Piñero (Hato Rey)
*Universidad (Río Piedras /University of Puerto Rico )
*Río Piedras (Río Piedras)
*Cupey
*Centro Médico (University of Puerto Rico, Medical Sciences Campus )
*San Francisco
*Las Lomas
*Martínez Nadal
*Torrimar (Guaynabo)
*Jardines
*Deportivo (Juan Ramón Loubriel Stadium )
*Bayamón (Bayamón)Each of the 16 stations boasts unique artwork and architectural style.
A maintenance depot and operations control center is located halfway along the route, between Martínez Nadal station and Torrimar station.
This section is linked from
List of rapid transit systems Fares
A single trip costs $1.50 ($0.75 if you transfer from an AMA bus) including a 2 hour bus transfer period. If you exit the station and wish to get back on the train the full fare must be re-paid; there is no train to train transfer period. Students and Seniors (60-74 years old) pay 75 cents per trip. Senior citizens older than 75 and children under 6 ride for free. Several unlimited passes are also available.
A stored-value multi-use farecard may be used for travel on buses as well as on trains. The value on the card is automatically deducted each time it is used. It is a system similar to the Metrocard system used in New York City.
Future plans
At present there are proposals to extend the rail system service to other municipalities such as Carolina, (two tunnels, each 1,282 ft [42 meters] in length south of the Río Piedras Station are already built for this purpose [ [http://www.auca.org/month/trenurbano.html American Underground-Construction Association] ] ) and extending the Phase I route to the San Juan district of Santurce through another underground segment below the Ponce de León Avenue. Other proposals include extending the rail system to
Old San Juan and theLuis Muñoz Marín International Airport .Already approved is a new “light intercity rail system” from San Juan to Caguas. The new line will include 2 stops in Caguas that will connect the Tren Urbano in San Juan with the Cupey or Centro Médico Station. Work will begin in early 2008 and is expected to end late 2009 or early 2010.
References
See also
*
Rail transport in Puerto Rico
*Transportation in Puerto Rico
* List of rapid transit systems
*Rail transport
*Metro systems by annual passenger rides External links
* [http://www.ati.gobierno.pr/ Tren Urbano Home Page] es icon
* [http://www.endi.com/XStatic/endi/template/columna.aspx?c=226441 Urge darle vida al Tren Urbano] – Editorial de El Nuevo Día es icon
* [http://www.trenurbanooutreach.com Tren Urbano Outreach] Page describing bids for future projects.
* [http://www.urbantransport-technology.com/projects/sanjuan/ Urban Transport Technology – San Juan]
* [http://tollroadsnews.info/artman/publish/article_1161.shtml/ FHWA Says Benefits Highly Localized]
* [http://www.artepublico.puertorico.pr/english/ambitos/tren_urbano/index.htm Puerto Rico Public Art Project – Tren Urbano] – Photos and information related to the artwork located on each of the train route's stations
* [http://www.transportation.siemens.com/ts/en/pub/home.htm Siemens]
Wikimedia Foundation. 2010.