- PKP class ET21
Infobox Locomotive Auto
name = ET21
powertype = Electric
caption = ET22-351 locomotive
builder = Pafawag
serialnumber =
buildmodel = 3E, 3E/1
builddate = 1957-1971
totalproduction = 726
whytetype =
aarwheels =
uicclass = Co'Co'
gauge = RailGauge|sg
leadingsize =
driversize = 1250 mm
trailingsize =
wheelbase =
length = 16820 mm
width = 3000 mm
height = 4620 mm
framesize =
weightondrivers = 20 t.
weight = 114 t.
locotenderweight =
fueltype =
fuelc
tenderc
consumption =
watercons =
electricsystem = 3000 V DC
collectionmethod = Pantograph
primemover =
enginetype = LKb635
aspiration =
displacement =
boiler =
boilerpressure =
feedwaterheater =
firearea =
tubearea =
fluearea =
tubesandflues =
fireboxarea =
totalsurface =
superheatertype =
superheaterarea =
cylindercount =
cylindersize =
rearcylindersize =
hpcylindersize =
lpcylindersize =
valvegear =
transmission = 4,541
topspeed = 100 km/h
poweroutput = 1860 kW
tractiveeffort = 32 kN
factorofadhesion =
locobrakes = Westinghouse
trainbrakes = Air
railroad =PKP
railroadclass = ET21 flag|POL
numinclass =
roadnumber =
officialname =
nicknames = Telewizor, Sputnik
locale =
deliverydate = 1957 - 71
firstrundate = 1957
lastrundate =
retiredate =
restoredate =
scrapdate =
currentowner =
disposition =|ET21 is a name for a Polish electric freight
locomotive produced between years 1957 - 1971 inPafawag . [cite web|url=http://www.kolej.pl/tabor/ET21/|title=Monografia lokomotywy ET21|author=Dawid Frątczak|publisher=|date=2001-2002|accessdate = 2007-07-26] It was the first post-war Polish electric locomotive, designed in 1955. [cite web|url=http://www.kolej.pl/jareks/wtpkp/et21.htm|title=Chester Home Page|author=|publisher=|date=|accessdate = 2007-07-26] Besides being delivered for PKP, ET21 locomotives were delivered to the mining industry, where they are used up to now.History
Mechanical part of the locomotive was designed in the "Rolling-stock Industry Central Bureau of Construction" (Pl.: Centralne Biuro Konstrukcyjne Przemysłu Taboru Kolejowego) in
Poznań , basing on instructions from the "Railway Electrification Office" (Pl.: Biuro Elektryfikacji Kolei). [cite web|url=http://www.kolej.pl/jareks/wtpkp/et21.htm|title=Chester Home Page|author=|publisher=|date=|accessdate = 2007-07-26] Electrical part of ET21 locomotive was tightly based on Soviet WŁ22M locomotive.Production started in 1957 at Pafawag inWrocław in co-operation with "Dolmel" (Bielsko-Biała ), "Elta" (Łódź ), "Elester" (Łódź) and "Apena" (Bydgoszcz ) companies. After first two units (prototypes) were ready the serial production started. [cite web|url=http://www.kolej.pl/tabor/ET21/|title=Monografia lokomotywy ET21|author=Dawid Frątczak|publisher=|date=2001-2002|accessdate = 2007-07-26] At the beginning those locomotives bore E600 designation, which was changed to E06 and after introducing RN-58/MK0001 norm to present ET21. [cite web|url=http://www.parowozy.pl/skansen/elektryczne/ET21/|title=Skansen taboru kolejowego w Chabówce|author=Miłosz P. Mazurek|publisher=|date=1998-2006|accessdate = 2007-07-28] By the end of 1958 18 new machines were ready.After producing 70 first units and gaining significant experience
Pafawag decided to introduce several technical changes into locomotives. This included decreasing weight by approx. 8 t., leveling weight on all axles, changing air intake system and crew cabin as well as installing electric carriage heating system.First locomotives were introduced intoWarsaw -Katowice -Gliwice line. As the number of engines was increasing they started serving on all electrified lines inPoland . After the introduction of the EU06 and EU07 locomotives, the ET21 was systematically transferred to freight only service. Systematical withdrawal of this series began on the brink of 1980s and 1990s and lasts until today. [cite web|url=http://www.kolej.pl/jareks/wtpkp/et21.htm|title=Chester Home Page|author=|publisher=|date=|accessdate = 2007-07-26] Some units are still used on mountainous areas, especially onTarnów -Krynica ,Kraków -Zakopane andWrocław -Wałbrzych lines. The only running first-series ET21 locomotive is ET21-57 machine located inChabówka railway museum. [cite web|url=http://www.skansen.hg.pl/1/Et2157.html|title=Elektrowóz ET21-57|author=Maciej Panasewicz|publisher=|date=|accessdate = 2007-07-28]ervice outside PKP
Alongside with delivering locomotives for
PKP Pafawag started selling machines for mining industry, specifically for "Coal Mining Filling Materials Company" (Pl.: Przedsiębiorstwo Materiałów Podsadzkowych Przemysłu Węglowego - PMP-PW). Those locomotives bore designation 3E - first series and 3E/1 - second, modernised series. The first locomotive delivered for PMP-PW was given 3E-10 number, the last one bore 3E/1-77 number.The main difference between PKP ET21 and 3E locomotives was that coal mining locomotives were lacking in carriage heating systems. 3E and 3E/1 machines were and are still used for transporting filling sand, power plant waste and coal, especially inUpper Silesia region. It is quite common to use those locomotives in couples, with one of them pulling and the other pushing the train.In the years 1973-1980
PKP borrowed several items of 3E/1 locomotives and changed their designation to ET21 with adding additional "9" figure to serial number. Such locomotives were running for PKP for over two years. In exchange PKP sold in the 1980s 14 units of ET21 locomotives to the industry. Those locomotives remained named ET21 but additional "1" figure was added to serial number. [cite web|url=http://www.kolej.pl/tabor/ET21/|title=Monografia lokomotywy ET21|author=Dawid Frątczak|publisher=|date=2001-2002|accessdate = 2007-07-28]Technical data
ET21 is a
Co-Co electric locomotive , suited for pulling freight trains weighing up to 2500 t. with top speed of 65 km/h or passenger trains with top speed of 100 km/h.Engines
The locomotive is equipped with six LKb-635 (though some sources give LKa-635) engines which are mounted on the
bogie s with a tram system . The engines propel the axles through 85:24 transmission. There are three ways of connecting the engines: series connection (all six engines in one series), series-parallel connection (three engines in one series - two groups) and parallel-series connection (two engines in one series - three groups). [9] Four-step reduction of engine excitation (up to 50%) is made by by-passing parts of main pole's windings withshunt s andresistor s. Shunts and resistors are in parallel connection with main pole's winding. Each engine has four steel main poles, isolated with varnish and four commutation poles made of one steel block. [cite web|url=http://www.kolej.pl/jareks/wtpkp/et21.htm|title=Chester Home Page|author=|publisher=|date=|accessdate = 2007-07-28]Bogies
A
Co-Co type of the locomotive means it is equipped with twobogie s, each of them having threeaxle s with separate propulsion for each wheel set. Bogies are coupled with each other. Box is supported on bogies with three slides. Middle slide supports it chassis in horizontal position during start and braking. [cite web|url=http://www.kolej.pl/tabor/ET21/|title=Monografia lokomotywy ET21|author=Dawid Frątczak|publisher=|date=2001-2002|accessdate = 2007-07-28]Body
The body and chassis are completely welded construction with crew compartments on both ends. It contains two machine compartments and one
high voltage compartment. Moving between crew cabins is enabled by 570 mm wide corridor running along the box wall. machine compartments are reached through the doors in the back walls of crew compartments.Both crew compartments are equipped in exactly the same way. It includes switch board, hand-brake and electric cooker on the left-hand side, drive controller, direction controller and brakes valves on the right-hand side. Air manometers and Hasler type
speedometer are mounted in front of the engineer's place. SHP (automatic train brake) button is located next to drive controller. Windscreens are equipped with 150W heater used during winter. Additional, 300W heater is located under thedashboard in order to heat crew's legs, but this was installed only in modernised 3E/1 version. Crew compartment "A" haswashbasin and clothes locker installed. Sound horn and sander buttons are located on the floor.In the wall of machine compartments large blinds are used as air intakes. On the opposite side, along the corridor rectangular blins are mounted between windows. Locomotives of 3E series have three windows on each side whilst 3E/1 locomotives have two windows on the side of machine compartments and three windows on the corridor side. There are
compressor s andblower s on the floors of machine compartments and two air tanks, 220 liters each, are mounted under the roof. In a non-modernised machine battery box was installed in "A" crew compartment whilst in a modernised version batteries were placed inside machine compartments. Air tank for raising the pantograph is located in "B" crew compartment.All high voltage devices and resistors are located inside high voltage compartment. In modernised version of ET21 locomotive this is placed in the middle part of the box. It is possible to completely remove the framework of high voltage compartment. Locomotive's roof is divided into several parts and over the high voltage compartment it is removable. [cite web|url=http://www.kolej.pl/tabor/ET21/|title=Monografia lokomotywy ET21|author=Dawid Frątczak|publisher=|date=2001-2002|accessdate = 2007-07-28]
Nicknames
*Telewizor ("
TV set ") - from the shape
*SputnikResources
Wikimedia Foundation. 2010.