- Moinak Hydro Power Plant
-
Moinak Hydro Power Plant Location Moinak Status Under construction Power station information Primary fuel Hydropower Generation units 2 Power generation information Maximum capacity 300 MW The Moinak Hydro Power Plant (Мойнакская ГЭС) is a hydro power plant on the Charyn River south of Almaty in Almaty Province of Kazakhstan. It is currently under construction and will be built in December 2011. It will have 2 individual turbines with a nominal output of around 150 MW which will deliver up to 300 MW of power[1] and will generate 1.27 billion kilowatt-hours of electricity per year. It is funded by Kazakhstan's and China's National Development Bank and is currently worth around 300 million USD.
References
Coordinates: 43°03′44″N 78°47′05″E / 43.06222°N 78.78472°E
Categories:- Hydroelectric power stations in Kazakhstan
- Under construction hydroelectric power stations
- Hydroelectric power plant stubs
Wikimedia Foundation. 2010.