Malutang Dam

Malutang Dam
Malutang Dam
Malutang Dam is located in China
{{{alt}}}
Location of Malutang Dam
Country China
Location Malipo County
Coordinates 23°01′01″N 104°44′39″E / 23.01694°N 104.74417°E / 23.01694; 104.74417Coordinates: 23°01′01″N 104°44′39″E / 23.01694°N 104.74417°E / 23.01694; 104.74417
Status Operational
Construction began 2004
Opening date 2009
Dam and spillways
Type of dam Embankment, concrete-face rock-fill
Height 156 m (512 ft)
Length 493 m (1,617 ft)
Volume 8,000,000 m3 (10,463,605 cu yd)
Impounds Panlong River
Type of spillway Controlled chute
Reservoir
Capacity 546,000,000 m3 (442,649 acre·ft)[1]
Catchment area 5,878 km2 (2,270 sq mi)
Power station
Commission date 2004-2010
Turbines Stage I: 2 x 50 MW Francis-type
Stage II: 3 x 100 MW Francis-type
Installed capacity 400 MW

The Malutang Dam is a concrete-face rock-fill dam (CFRD) on the Panlong River in Malipo County, Yunnan Province, China. The primary purpose of the dam is hydroelectric power generation and the power plant was constructed in two stages. Stage I consists of a 40 m (131 ft) tall gravity dam which diverted water through a 3,460 m (11,352 ft) long tunnel to a 100 MW above ground power station downstream.[2] Construction on Stage I began in 2002 and the first of 50 MW Francis turbine-generators was commissioned in October 2004, the second in January 2005. Stage II was the construction of a 156 m (512 ft) tall CFRD (Malutang Dam) 200 m (656 ft) downstream of the Stage I dam. Stage II's power station contains three 100 MW Francis turbine generators. Construction on Stage II began in August 2005 and the reservoir began to fill in October 2009. In December 2009, the first 100 MW generator was operational and the last two by May 2010. Malutang Dam's reservoir submerged the Stage I dam but the Stage II intake tower receives water for both stages, allowing Stage I to continue to operate.[3][4][5]

See also

References

  1. ^ "China’s highest CFRDs". Chinese National Committee on Large Dams. http://www.chincold.org.cn/dams/DamInformation/damsinchina/webinfo/2010/07/1279253973981691.htm. Retrieved 4 September 2011. 
  2. ^ "Malutang completed the first phase of power plant" (in Chinese). People's Government Office of Wenshan. http://www.ynws.gov.cn/Detail.aspx?ID=3565. Retrieved 4 September 2011. 
  3. ^ "Malutang Hydropower" (in Chinese). Baidu. http://baike.baidu.com/view/4548220.htm. Retrieved 4 September 2011. 
  4. ^ "Hydroelectric Power Plants in China - Yunnan". IndustCards. http://www.industcards.com/hydro-china-yunnan.htm. Retrieved 4 September 2011. 
  5. ^ "Malutang second phase started to store water station" (in Chinese). China Water Conservancy and Hydropower Engineering Bureau Qujing Branch XIV. http://www.fcbmis.com/qjfj.fcbweb/sgjdgl/2009/1112/0911121539545JFJ88CH48DJFF181G3E.html. Retrieved 4 September 2011. 

Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать реферат

Look at other dictionaries:

  • List of dams and reservoirs in China — This list is incomplete; you can help by expanding it. The Bikou Dam on the Bailong River in Gansu Dams and reservoirs in China are numerous and have had a profound effect on the country s development a …   Wikipedia

  • CFRD — ist die Abkürzung von „Concrete face rockfill dam“ (oder: „Concrete faced rockfill dam“) und bedeutet „Steinschüttdamm mit Betonabdeckung“, eine Bauart für Talsperren Absperrbauwerke. Ein CRFD Damm ist ein Steinschüttdamm mit bewehrten… …   Deutsch Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”