The Cross London Route Utilisation Strategy (CLRUS) was the second[1] of the route utilisation strategies (RUS) published by Network Rail (NR), in August 2006. It was included in a map published by the Office of Rail Regulation as established in May 2007 [2].

The CLRUS covers mainly orbital railway lines in North London, including the North London Line (NLL), the West London Line (WLL) and the Gospel Oak to Barking line (GoBLin), but also the South London Line (SLL) and, to a lesser extent, TfL's East London Line (ELL).

Contents

Present usage of the lines involved

The lines involved provide significant orbital passenger services and important freight routes, as well as other movements.

The most frequent passenger services, 4 trains per hour (tph) in each direction during the working week, are on the NLL. The WLL and the GoBLin basically have 2 tph each. There are some additional trains on all these lines during peak hours. The SLL has 2 tph. The ELL is currently closed, pending construction of northern and southern extensions; it formerly had about 5 tph.

Freight services include those having destinations on or near to the lines, as well as cross-country freight movements not originating or terminating in London, for which presently these lines are the most viable route.

Summary of strategies derived

Short term recommendations

  • additional peak services to overcome the worst of the peak-hour overcrowding. Transport for London (TfL) has funded the provision of at least some of these.
  • additional standing space on anticipated new stock
  • four-car rather than three-car trains on NLL and WLL, requiring lengthening of many platforms

Medium term recommendations

Additional services in each direction, all day, per hour:

  • two trains between Stratford and Camden Road on the NLL, and onward to Queens Park on the Watford DC Lines
  • extending the existing two trains from Clapham to Willesden Junction onwards via the NLL to Gospel Oak and thence over the GoBLin to Barking
  • diverting and extending other services on the WLL south-east to the Croydon area

Longer term (beyond 2014)

  • investigating shifting of some freight services to alternative lines, some avoiding the London area, to allow more pathways with a view to achieving at least four passenger trains per hour over all the routes.

Subsequent developments

Passenger services on most of the lines involved were transferred to the control of TfL on 11 November 2007, and have been rebranded London Overground [3]. TfL and Network Rail are pursuing the recommendations in the RUS.

With the removal of the Eurostar depot to Temple Mills in November 2007, access via the WLL to the former depot at Old Oak Common is no longer required.

During autumn 2008, works requiring extended closure were conducted on extensive parts of the London Overground network, mainly to allow the passage of freight trains to W10 gauge. Further extensive works, requiring selective closure, are scheduled to be carried out in 2009 and early 2010[4].

Construction works on the ELL and its extensions at both ends are at an advanced stage. For example the bridge over Shoreditch High Street that links the realigned route to Whitechapel with the Haggerston viaduct has been installed. The extended line between Dalston Junction in the north and Crystal Palace and West Croydon in the south is due to open as part of London Overground in 2010.

TfL are promising additional/replacement rolling stock commencing (as originally stated) in 2008, then 2009, now promised for 2010. However, lengthening of trains to four units, along with increase in service to 4tph over the whole network, appears to have been pushed into the medium term, planned for 2011.[5]

References

  1. ^ The published NR CLRUS document
  2. ^ ORR May 2007 map of RUSs
  3. ^ London Overground (Tfl website)
  4. ^ London Overground works
  5. ^ London Overground Next Steps

Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать реферат

Look at other dictionaries:

  • Network Rail Cross London Route Utilisation Strategy — This is the second [http://www.networkrail.co.uk/browse%20documents/rus%20documents/route%20utilisation%20strategies/cross%20london/37846%20cross%20london%20rus.pdf The published document] of the route utilisation strategies (RUS) published by… …   Wikipedia

  • South London Route Utilisation Strategy — Network Rail s (NR) South London Route Utilisation Strategy (SLRUS), published in March 2008[1][2][3] (SLRUS) was the eighth Route Utilisation Strategy to be produced. By default, RUSs are established by the Office of Rail Regulation (ORR) unless …   Wikipedia

  • Route Utilisation Strategy — Not to be confused with Network Route Utilisation Strategy. Network Rail (NR) has an obligation, transferred from the abolished Strategic Rail Authority, to periodically produce Route Utilisation Strategy (RUS) documents.[1] The current programme …   Wikipedia

  • Greater Anglia Route Utilisation Strategy — The Greater Anglia Route Utilisation Strategy is a Route Utilisation Strategy published by Network Rail in December 2007.[1] It was the sixth RUS to be produced. The area covered includes the whole of Route 5 West Anglia (WA) and Route 7 Great… …   Wikipedia

  • East Coast Main Line Route Utilisation Strategy — The East Coast Main Line Route Utilisation Strategy is a Route Utilisation Strategy (RUS), published by Network Rail in February 2008 [1][2][3] It was the seventh RUS to be produced. By default, RUSs are established by the Office of Rail… …   Wikipedia

  • Freight Route Utilisation Strategy — The Freight Route Utilisation Strategy is a Route Utilisation Strategy, published by Network Rail in March 2007.[1][2][3] It is one of only two (the future Network RUS is the other) which have the perspective of the network as whole. It was… …   Wikipedia

  • London Overground — Eröffnung: 11. November 2007 Betreiber: Transport for London Spurweite: 1435 mm Streckenlänge …   Deutsch Wikipedia

  • London Overground — Lugar Ubicación Gran Londres Hertfordshire (Reino Unido) …   Wikipedia Español

  • London Overground — Not to be confused with London Underground. London Overground …   Wikipedia

  • Network Rail Route 6 (North London Line and Thameside) — Strategic Route 6 North London Line and Thameside is the designation given by Network Rail to a grouping of railway lines in Greater London and the East of England region that encompasses the London, Tilbury and Southend Line and overground… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”