- Albertirsa–Zakhidnoukrainskaya–Vinnytsia powerline
-
Albertirsa–Zakhidnoukrainskaya–Vinnytsia powerline Location Country Hungary, Ukraine Coordinates 47°13′28″N 19°34′48″E / 47.22444°N 19.58°E
48°15′6″N 22°22′00″E / 48.25167°N 22.3666667°E
49°23′11″N 24°14′57″E / 49.38639°N 24.24917°E
49°09′54″N 28°43′23″E / 49.165°N 28.72306°EGeneral direction west–east From Albertirsa, Hungary Passes through Zakhidnoukrainskaya To Vinnytsia, Ukraine Construction information Construction started 1975 Commissioned 1979 Technical information Type Overhead transmission line Type of current HVAC Total length 479 km (298 mi) Power rating 2,000 MW AC Voltage 750 kV The Albertirsa–Zakhidnoukrainskaya–Vinnytsia powerline is a power transmission line between Ukraine and Hungary. It is a part of the former "Mir" transmission system between the Soviet Union and Comecon countries. As of today, it is the only 750 kV-powerline in Hungary and one of the few powerlines operated with this voltage in the European Union.
Contents
History
On 28 February 1974, the USSR, Bulgaria, Hungary, GDR, Poland and Czechoslovakia signed a cooperation agreement on construction of the 750 kV-line between Vinnytsia and Albertirsa, and substations Vinnytsia, Zakhidnoukrainskaya and Albertirsa.[1] Construction started in 1975 and it went in service in 1979.[2][3]
Since the synchronization of the power grid of Hungary with that of the synchronous grid of Continental Europe (ENTSO-E) and because of economic reasons, the powerline went out of service in 1993, but was put in service again in 2002 after some new equipment was installed.[2][4]
Technical description
The 479-kilometre (298 mi) long power line connects the substation of Albertirsa in Hungary with Zakhidnoukrainskaya substation, which is situated east of Borodczyce in Ukraine. It uses as suspension pylons portal pylons. These are free-standing structures in areas, which are sometimes flooded and guyed in areas without flood-danger. As anchor pylons towers with one crossbar are used whereby the conductor is led around the pylon structure. The powerline was designed for the transmission of 2,000 MW electricity.[2]
See also
- Rzeszów–Khmelnytskyi powerline
- Vetrino–Isaccea–Yuzhnoukrainsk powerline
References
- ^ Ginsburgs, George (1987). A calendar of Soviet treaties, 1974–1980. 33. BRILL. p. 9. ISBN 9789024736287. http://books.google.com/books?id=pSyu2DzyfNoC&pg=PA9. Retrieved 2009-12-12.
- ^ a b c Bán, G.; Prikler, L.; Bánfai, G. (2003). "750 kV Reactive Power Control, Automatic Reclosing and Overvoltage Protection" (PDF). IEEE Bologna Power Tech Conference. Bologna: Institute of Electrical and Electronics Engineers. http://www.labplan.ufsc.br/congressos/PowerTech/papers/268.pdf. Retrieved 2009-12-12.
- ^ Trzeciakowski, Witold (August 1982) (PDF). Energy: Prospects and Policy issues in Intra-CMEA Relations. International Institute for Applied Systems Analysis. CP-82-52. http://www.iiasa.ac.at/Admin/PUB/Documents/CP-82-052.pdf. Retrieved 2010-01-31.
- ^ Organisation for Economic Co-operation and Development (2000). Regulatory reform in Hungary. OECD reviews of regulatory reform. p. 266. ISBN 9789264176676. http://books.google.ee/books?id=OlxELWQAxEQC&pg=PA265&lpg=PA266. Retrieved 2010-04-02.
Categories:- 1979 establishments
- Electric grid interconnections
- Electric power in Hungary
- Electric power in Ukraine
Wikimedia Foundation. 2010.