Ingula Pumped Storage Scheme

Ingula Pumped Storage Scheme

The Ingula Pumped Storage Scheme (previously named Braamhoek) is under construction by Eskom in the escarpment of the Little Drakensberg range straddling the boarder of the Free State and KwaZulu Natal, South Africa. The Scheme will consists of an upper and a lower dam 4.6 km apart and connected by tunnels. The underground powerhouse will house 4 x 333MW reversible pump-turbines. Construction is due to be completed in 2012 [http://www.busrep.co.za/index.php?fArticleId=4162384&fSectionId=552&fSetId=662] .

The pumped-storage hydroelectricity plant will be used to generate electricity during the peak demand periods of the day. At night, excess power on the grid generated by conventional coal and nuclear plants is used to pump water to the Upper Reservoir.

References

External links

* [http://www.eskom.co.za/live/content.php?Item_ID=2329 Eskom's Ingula Pumped Storage Scheme page]


Wikimedia Foundation. 2010.

Игры ⚽ Нужна курсовая?

Look at other dictionaries:

  • Eskom — Articleissues criticisms = July 2008 expand = July 2008 laundrylists = July 2008 OR = July 2008 POV = July 2008 rewrite = July 2008 This article is about the South African electricity utility. For the similarly named German computer company, see… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”