John Killaly

John Killaly

"'John Killaly" (1776-1832 was the most significant Irish canal engineer, working originally for the Grand Canal company and later as an engineer under the "Directors-General of Inland Navigation".cite journal|title=John Killaly - Irish Canal Engineer|author=Ronald Cox|journal=Papers preseted by the Heritage Society of Engineers Ireland|date=21 March 2005]

Career

The name Killaly is rare and associated with the county of Offaly, but no record of his parentage or birthplace has been discovered and it is possible that he was born and educated in England.cite paper|author=Ron Cox|title=Biographical Dictionary of Civil Engineers|volume=1, 1500-1830|Editor=Prof Sir A. Skempton|publisher=London, Thomas Telford|date=2002] In around 1791 Killaly started carrying out some surveys for the Grand Canal. By 1794 he had made such an impression on the directors that he was asked to join the company at a salary of £150 per annum. By 1796 they reported that from being 'a mere measurer and surveyor' he had become 'the complete superintendent of all kinds of work'. He took on the most difficult stretch of the canal, across the Bog of Allen close to Edenderry, which at John Smeaton's suggestion had been been built high across the surface of the bog. William Jessop had attempted to stem the water leakage by using 'ribs of clay' and eventually one of the directors of the company, Richard Griffith, challenged this approach and Killaly adopted a much more gentle profile that stabilized the canal, though it was to remain a problem. For the extension from Tullamore to Shannon Harbour another bog had to be crossed near the river Brosna, and this time Killaly carried out extensive drainage works over several years along the line of the canal and allowed the land to subside before excavating the canal. [cite book|title=Ireland's Inland Waterways|author=Ruth Delaney|publisher=Belfast, Appletree Press|date=2004]

By this time he had become the company's chief with a salary of around £800. On the opening of the canal in 1803 he became an engineer under the Directors-General of Inland Navigation, whilst still receiving a reduced salary from the Grand Canal company until 1810. In 1805, he was sent on a six-week fact finding tour of engineering works in England and Wales, reporting on canals, bridges, docks and railroads. On his resignation in 1810 the Board recorded that Killaly had 'conducted himself with the most unwearied assiduity and the most perfect and unimpeached integrity' during his service to the company.

Together with John Brownrigg, he inspected the state of the River Shannon Navigation and made a comprehensive report to the Directors with a number of proposals for action on the upper part. He supervised the construction of lateral canals at Athlone and Meelick. He also advised on the Corrib, Lagan, Newry and Suir navigations. He surveyed an extension to the Royal Canal to Lough Allen but by this time the Royal Canal Co was in financial trouble and was declared bankrupt in 1813, leaving the Directors-General to complete the line to the Shannon. Killaly resurveyed the route from the summit west of Mullingar to a new entry into the Shannon using the "Camlin River". This was let as a single contract and completed substantially on time and within budget in 1817, including a major aqueduct across the River Inny. In 1814 he surveyed the line of a canal to connect Lough Erne with Lough Neagh. The plan was approved and the "Ulster Canal Co" was eventually formed in 1825 to undertake construction, though he was instructed to resurvey it to cut costs.

In 1823, he was asked to re-examine his plans for an extension of the Grand Canal to Ballinasloe in County Galway and offered to act as Directing Engineer on condition that his son, Hamilton be appointed as superintending engineer. He used his experience of driving through bogs by driving a drainage channel along the centerline of the canal with similar and interconnecting drains at 25 and 60m on each side with transverse drains. In this way a uniform settlement was achieved over a wide area, avoiding the need for high embankments. [B & H Mullins, Transactions ICEI, 1848]

Between 1820 and 1826, Killaly was seconded by the government to deal with some 88 miles of road improvements to provide employment in Clare, parts of Limerick, Galway, Mayo and Roscommon, including numerous bridges. At times he was responsible for more than 9,000 workers in these famine relief schemes. Reporting in 1822, Killaly said "the great destruction of morals and waste of public property which have taken place in the county of Clare from this cause (jobbing) is beyond my power to calculate" and in 1830 he expressed the hope that the presentment system would be eradicated.

Family

In 1799, Killaly married Alicia Hamilton, a daughter of George Hamilton, the owner of the principal flour mill on the Tullamore River. In 1804, Killaly leased the mill property from him at an annual rent of the £300 and moved into the Mill House, with his growing family, which eventually numbered four sons and three daughters. Three of his sons (Hamilton Hartley, Richard Griffith and Benjamin) later graduated from the University of Dublin and two of them became civil engineers like their father. Hamilton Hartley Killaly emigrated to Canada and became an engineer on the Welland Canal and later the first Chairman and Chief Engineer of the Board of Works for Lower Canada. His son became the first president of the Canadian Society of Civil Engineers in 1887.

On his death in 1832 a large memorial was erected by his widow in St. Patrick's Cathedral, Dublin.

References


Wikimedia Foundation. 2010.

Игры ⚽ Нужно сделать НИР?

Look at other dictionaries:

  • River Shannon — The River Shannon ( Sionainn or Sionna in Irish) is, at 386 km (240 miles), the longest river in Ireland. [http://www.discoverireland.com/gb/about ireland/nature/ Accessed: 22nd July, 2008] [http://encarta.msn.com/encyclopedia… …   Wikipedia

  • Grand Canal (Ireland) — The Grand Canal ( ga. An Chanáil Mhór) is the southernmost of a pair of canals that connect Dublin, in the east of the country, with the River Shannon in the west, the two canals nearly encircling Dublin s inner city. Its sister canal on the… …   Wikipedia

  • Premier parlement de la province du Canada — Parlement de la Province du Canada Parliament of the Province of Canada Première législature (14 juin 1841 au 23 sept. 1844) …   Wikipédia en Français

  • Premier parlement de la province du canada — Le Premier parlement de la province du Canada siégea du 14 juin 1841 jusqu en 1843. Toutes les séances eurent lieu à Kingston au Canada Ouest. La dissolution fut annoncée le 23 septembre 1844[1]. Sommaire 1 Élections …   Wikipédia en Français

  • Première assemblée législative de la Province du Canada — Premier parlement de la province du Canada Le Premier parlement de la province du Canada siégea du 14 juin 1841 jusqu en 1843. Toutes les séances eurent lieu à Kingston au Canada Ouest. La dissolution fut annoncée le 23 septembre 1844[1].… …   Wikipédia en Français

  • 1st Parliament of the Province of Canada — The 1st Parliament of the Province of Canada was in session from June 15 1841 to 1843. Elections were held in the Province of Canada in April 1841. All sessions were held at Kingston, Canada West.In 1841, the District Councils Act was passed… …   Wikipedia

  • Ashbury College — Infobox Education in Canada name=Ashbury College motto=Probitas, Virtus, Comitas motto translation=Honesty, Courage, Kindness students=460 (9 12) city=Ottawa province=Ontario url=http://www.ashbury.ca/ principal=Tam Matthews principal… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”