Fălciu-Berezeni Wind Farm

Fălciu-Berezeni Wind Farm

Infobox_Power_Station
station_name=Fălciu-Berezeni Wind Farm


caption=
location=Fălciu, Berezeni, Vaslui County
owner=E.ON
status=Approved
fuel_type=Wind
mine_type=
conveyance=
cooling_water=
technology=
combined_cycle=
turbines=30
reciprocating_engines=
pumped_storage=
max_capacity= 30 MW
commissioned=
decommissioned=
extra=
The Fălciu-Berezeni Wind Farm is a proposed wind power project in Vaslui County, Romania. It will have 30 individual wind turbines [ [http://www.standard.ro/articol_60388/e_on_investeste_in_prima_transa_pana_la_170_mil______in_trei_parcuri_eoliene.html E.ON investeste in prima transa de parcuri eoliene ro] ] with a nominal output of around 1 MW which will deliver up to 30 MW of power, enough to power over 11,880 homes, with a capital investment required of approximately US$ 68 million.

References


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать реферат

Look at other dictionaries:

  • List of wind farms in Romania — The Tihuţa Pass is situated at an altitude of 1,200 m (3,900 ft). As of 2008, there is an installed capacity of 76 megawatts (MW) of wind power in Romania, up from the seven MW installed capacity in 2007.[1] …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”