Hauauru ma raki

Hauauru ma raki

Infobox_Power_Station
station_name= Hauãuru mã raki


location= Waikato, New Zealand
owner= Contact Energy
status=
fuel_type= Wind
mine_type=
conveyance=
cooling_water=
technology=
combined_cycle=
turbines= 180 (maximum)
reciprocating_engines=
pumped_storage=
max_capacity=540MW
commissioned=
decommissioned=
extra=

Hauãuru mã raki is a wind farm being developed on the Waikato coast of New Zealand. [cite web | title = Thumbs-up to huge wind farm
publisher = Waikato Times | Author = Bruce Holloway | date = 2007-10-17 | url = http://www.stuff.co.nz/4241166a11.html | accessdate = 2008-09-21
]

It would extend 34km along the coast between Port Waikato and Raglan. [cite web | title = Hauãuru mã raki waikato wind farm project description
publisher = Contact Wind Limited and Contact Energy Limited | date = 2008-06 | url = http://www.contactenergy.co.nz/web/pdf/our_projects/waikatowindfarm/june2008/T01_HMR_Project_Description_Main.pdf | accessdate = 2008-09-21
] The project covers an area of convert|16797|ha|km2 and has a capacity of up to 540 MW. The wind farm would be owned and operated by Contact Wind Ltd.

Contact Energy applied for resource consents in June 2008. The first electricity from the wind farm is planned for 2013 with the project due for completion by 2016. The project would provide power for up to 180,000 households.

In September 2008, the Energy Minister "called in" the project, meaning that instead of going though the standard resource consent process, the decision will be made by an independent board of enquiry. The move is possible if a project is considered to be of "national significance"," [http://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=10529258 Mallard calls in Raglan wind farm decision] " - "The New Zealand Herald", Wednesday 27 August 2008] and is generally (but rarely) used when the decision on an important project might otherwise be held up for a long time due to the standard process.

See also

*Wind power in New Zealand

References

External links

* [http://www.contactenergy.co.nz/web/view?page=/contentiw/pages/ourprojects/waikatowindfarm&vert=pr Contact Energy] , Hauāuru mā raki - Waikato wind farm


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать реферат

Look at other dictionaries:

  • HMR — The acronym HMR may mean:* Hazardous materials regulations * The IATA code for Hamar Airport, Norway * Hauāuru mā raki, a wind farm in New Zealand * Health Management Resources * Historisch Museum Rotterdam * Hmar language, a language of India;… …   Wikipedia

  • Contact Energy — Type Public (NZX: CEN) Industry Electricity generation Electricity retailing …   Wikipedia

  • Wind power in New Zealand — As of early 2008, wind power in New Zealand has an installed capacity of 321 MW, nearly double the 2006 capacity. Wind power now provides enough electricity to meet the needs of 145,000 New Zealand households,cite web last = first = authorlink =… …   Wikipedia

  • Electricity sector in New Zealand — The electricity sector in New Zealand uses mainly renewable energy sources such as hydropower, geothermal power and increasingly wind energy. The 70% share of renewable energy sources makes New Zealand one of the most sustainable countries in… …   Wikipedia

  • Maraetai Power Station — Maraetai Power Station …   Wikipedia

  • Meremere Power Station — Meremere Power Station …   Wikipedia

  • Nga Awa Purua Power Station — Nga Awa Purua Power Station …   Wikipedia

  • Ngatamariki — Ngatamariki …   Wikipedia

  • Ohaaki Power Station — Ohaaki Power Station …   Wikipedia

  • Ohakuri Dam — Ohakuri Power Station Ohakuri dam and powerhouse from the north …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”