- CEZ Fântânele Wind Farm
Infobox_Power_Station
station_name=CEZ Fântânele Wind Farm
caption=
location=Fântânele,Constanţa County
owner=CEZ Group
status=Approved
fuel_type=Wind
mine_type=
conveyance=
cooling_water=
technology=
combined_cycle=
turbines=300
reciprocating_engines=
pumped_storage=
max_capacity= 600 MW
commissioned=2009
decommissioned=
extra=The CEZ Fântânele Wind Farm is an under construction wind power project in Fântânele,
Constanţa County ,Romania . It will consisted of two individual wind farms connected together. It will have 300 individualwind turbine s [ [http://www.zf.ro/articol_184753/cez_face_energie_eoliana_cat_un_reactor_de_la_cernavoda.html CEZ to build wind farms in the Dobrogea region ro] ] with a nominal output of around 2 MW which will deliver up to 600 MW of power, enough to power over 400,000 homes, with a capital investment required of approximately US$ 1.65 billion [ [http://www.tmctv.ro/articol_47157/cez_va_investi_1_1_miliarde_euro_intr_un_parc_eolian_in_romania.html CEZ va investi 1.1 miliarde de euro intr-un parc eolian in Romania ro] ] .References
Wikimedia Foundation. 2010.