- Galloping Goose
Galloping Goose is the name given to a series of seven
railcar s (also known as "motors") built in the 1930s by theRio Grande Southern Railroad (RGS) and operated until the end of service on the line in the early 1950s.Originally running steam locomotives on narrow gauge railways, the perpetually-struggling RGS developed the first of the "geese" as a way to stave off bankruptcy and keep its contract to run mail to towns in the
Rocky Mountains inColorado . There was not enough passenger or cargo income to justify continuing the expensive steam train service at then-current levels, but it was believed that a downsized railway would return to profitability. The steam trains would transport heavy cargo and peak passenger loads but motors would handle the lighter loads.Motors were not only less expensive to operate, but were also significantly lighter, thus reducing impact on the rails and roadbeds. This cost saving meant that the first Goose was paid off and making a profit within three weeks of going into service. RGS built more Geese, and operated them until the company abandoned their right-of-way lines in 1952.
History
The RGS built its first motor in 1913, as a track maintenance crew vehicle. This was wrecked in 1925, but inspired the idea of using motors for scheduled service.
All of the "geese" were built in the railroad's shops at
Ridgway, Colorado . The first was built in 1931 from the body of aBuick "Master Six" four-door sedan. It was more conventional in its construction than the later geese, though it had a two-axle truck in place of the front axle. Part of the rear of the car was replaced by a truck stake-bed for carrying freight and mail; this was later enclosed and partially fitted with seating. It was used for two years to carry passengers, US Mail, and light freight before being scrapped. A second "goose" was built in the same year from another Buick, but later versions usedPierce-Arrow bodies except for #6, which was constructed partly out of parts taken from the scrapped #1.Numbers 2 and 6 were constructed with two trucks, with the rear truck powered on both axles. #2 had an enclosed freight compartment (like a very short
boxcar ), while #6 had an open bed similar to #1 (but larger). It was used only for work train service. The other four had three trucks and were articulated in the same manner as atractor-trailer truck . In these, the second truck was powered, and the freight compartment was essentially a conventional boxcar.Initially the "geese" were painted in black and dark green. In 1935 they were all painted in a silver scheme which they retain to this day, though the style of lettering and heralds changed over the years. In 1945 #3, #4, and #5 were rebuilt with Wayne bus bodies (at least the front half) replacing the old Pierce-Arrow bodies. This provided more passenger seating and comfort. A year later they also received new war surplus GMC engines.
In 1950, when the railroad finally lost its mail contract (in favor of highway mail carriers), #3, #4, #5, and #7 were converted for tourist operations. Large windows were cut in the sides of the freight compartments, and seating was added. A figure of a running goose and the words "Galloping Goose" were added to the carbody doors. This service lasted only two years, and the last work of the "geese" on their home line was to take up the rails.
It is unclear exactly where the name "Galloping Goose" comes from. It is mostly commonly suggested that it referred to the way the carbody and the freight compartment tended to rock back and forth on the line's sometimes precarious track. It is also suggested, though, that the name arose because the "geese" were equipped with air horns rather than the whistles of the steam locomotives. The name was used informally for years before the tourist operations, though the railroad officially referred to the units as "motors".
A similar unit was built for the
San Cristobal Railroad and was rebuilt by the RGS in 1934-35. When the San Christobal folded in 1939, this unit was returned to the RGS and dismantled, with some parts going to rebuild and maintain the #2 Goose.urviving units
Of the seven "geese", only #1 does not survive, though a replica was built in 2000 for the
Ridgway Railroad Museum . The other six are located as follows:*Geese #2, #6, and #7 are preserved at the
Colorado Railroad Museum and are operational.
*Goose #3 was sold toKnott's Berry Farm and is operated occasionally, primarily during off season periods, when park attendance is low.
*Goose #4 is on static display inTelluride, Colorado .
*Goose #5 was bought by the city ofDolores, Colorado . After restoration in 1998 it is now operated from time to time on the Cumbres and Toltec and Durango and Silverton tourist railroads.References
* [http://drgw.free.fr/RGS/Goose/Goose_en.htm Rio Grande Southern Galloping Goose]
* [http://rgsrr.home.comcast.net/rgs/goose_tline.html Galloping Goose timeline]Gallery
External links
* [http://users.viawest.net/~bdwhite/rgstec14.htm Driving Rio Grande Southern Goose Number 7]
Wikimedia Foundation. 2010.