Blue Water Offices Iaşi

Blue Water Offices Iaşi

Infobox Skyscraper
building_name =Blue Water Offices


caption =
year_highest =
year_end =
plural =
location =Iaşi, Romania
coordinates =
status =Approved
groundbreaking =2009
constructed =
est-completion =
opening =
demolished =
destroyed =
use =
antenna_spire =
roof =70 m
top_floor =
floor_count =20
elevator_count =
cost =
floor_area =44,000 m2
architect =
engineer =
contractor =
developer =
owner =Timoran Holdings Singapore

Blue Water Offices is a future complex in Iaşi with a total of 20 floors and a surface area of 44,000 m2. The complex will have a residencial area of 16,000 m2, office and commercial area of 9,000 m2 and an expo area of 19,000 m2.

The complex will have a central tower of 20 floors and other several buildings between 8 and 18 floors.

External links

[http://www.ieseanul.ro/saptamanal/gigantul-de-la-sinta-2503516 Presentation in Romanian]


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Dâmbovița Center — Casa Radio Another view of the unfinished Casa Radio …   Wikipedia

  • Dana Complex — General information Status Under construction Location Satu Mare, Romania …   Wikipedia

  • Mamaia North Complex — Mamaia North General information Construction started 2009 Completed 2012 Opening 2012 (est.) Height Antenna spire 220 m (720& …   Wikipedia

  • Construction industry of Romania — Construction activity (about 10% of GDP) has increased due to recent tax incentives. Romania is becoming an increasingly popular choice for British property investors, according to recent research from Currencies Direct. [1] The latest Global… …   Wikipedia

  • Charles de Gaulle Plaza — General information Status Complete …   Wikipedia

  • Millennium Business Center — General information Status Complete Location Bucharest, Rom …   Wikipedia

  • City Gate Towers — Turnurile Porţile Oraşului General information Status Complete …   Wikipedia

  • Mamaia Beach Residential — Mamaia Beach General information Status Approved Construction started 2012 Completed 2015 Opening 2015 (est.) …   Wikipedia

  • Colosseum Tower Bucharest — Colosseum Tower General information Status Approved Location Bucharest, Romania Construction started 2009 Opening 2011 …   Wikipedia

  • Niro Hotel Tower — General information Status Approved Location Bucharest, Romania Construction started 2009 Opening 2011 …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”