- Iberdrola Tower
Infobox Skyscraper
building_name= Iberdrola Tower
year_started built= 2007
year_finished= 2011
location=Bilbao ,Spain
status=Under construction
height_meters= 165
height_feet= 541
height_stories= 40
construction_period= 2007-2011
antenna_spire= convert|165.0|m|ft|1|abbr=on
roof= convert|165.0|m|ft|1|abbr=on
top_floor= convert|165.0|m|ft|1|abbr=on
floor Count= 40
Basement Floors= 5
floor_area= convert|50000|m2|sqft|-3|abbr=on
elevator_count= 21
main_contractor= Promotora Vizcaina
management= Apex Inmobiliaria S.A.
architect= flagicon|ArgentinaCésar Pelli The Iberdrola Tower (Iberdrola Dorrea in Basque), is an office skyscraper under construction in
Bilbao ,Spain . The tower will have a height of 165metre s (541 feet) tall and have 40floor s. The first eight floors of the tower will hold a hotel by the Spanish hotel chain ABBA. The remaining floors will have an office usage. The tower, built asIberdrola 's headquarters, will be the tallest building in the Basque Country and the city ofBilbao .The tower will be built in
Abandoibarra a former industrial zone located next to the river that is being renewed since the early 1990s and where other emblematic projects such asGuggenheim Museum Bilbao andEuskalduna Conference Centre and Concert Hall . There will be two residential buildings designed byCarles Ferrater flanking the skyscrapers. The entrance to the tower will be located at the Euskadi Plaza.History of the building
Design and the Abandoibarra masterplan
In 1992 a public society, Bilbao Ria 2000, was created for the urban regeneration of the metropolitan
Bilbao . The goal of that public company was to regenerate areas afected by the industrial crisis of the 1970s and converting former under used industrial lots into housing blocks, office buildings, green areas and other buildings of different usages.One of those former industrial areas was Abandoibarra, located right next to the river, and between the La Salve bridge and the bankrupt Euskalduna shipbuilding company. In the early 1990s the regional authority of the province of
Biscay choseCésar Pelli and its team to design a masterplan for the future development of the 348,5000 square metre area. One of the first proposals included two towers of 200 metres, but the final project that included the participation of the architect team Aguinaga y Asociados Arquitectos presented its final proposal with a single 150 metre office tower and several residential blocks of 10 floors.Biscay's Diputation tower
In 1998 the regional authority of the province of Biscay (Bizkaiko Foru Aldundia or Diputacion Foral de Bizkaia) announced its intention to sell all of its buildings scattered throught the city of
Bilbao and moving all of its offices to the 150 metre tower. The lot, owned at that time byRenfe was sold for 79 millioneuro s to the regional authority. The tower, originally expected to have 50,000 square metres of gross office space, was deemed as not enough for the Diputacion and an additional 10,000 square metres were included. The height increased from 150 metres to 160 to fit the new requirements by the Diputacion.In 2003, just after the provincial elections had taken place,
Jose Luis Bilbao , the newly elected ruler of the authority ofBiscay , decided to scrap the plans for the tower, complaining about the high cost of the building.Iberdrola Tower
After months of speculation about possible tenants wanting to move to the tower, the city hall of
Bilbao reached an agreement with Basque utitilities companyIberdrola in July 2004.Iberdrola would occupy 10,000 square metres of the tower establishing its international headquarters at the top of the tower, renting the rest of the office space. The operation would be financed by the selling of its former headquearters in the Gardoki street and another building in Alameda Urquijo.The tower will have 165 metres and 40 floors (36 typical plus 4 mechanical floors) and 5 underground levels. The tower is expected to cost around 210 million euros and will includes 717 car park units. Floors 1 to 5 will hold a five star ABBA hotel, with 150 rooms.
Construction
After some months of site preparation, the first rock caisson ceremony was held on March 19 2007. Then excavation for the five underground floors began. At the same time an underground car park is being built below the future Euskadi Plaza, two residential buildings by Carles Ferrater, the library of the
University of Deusto and a residential building by Eugenio Aguinaga.TheIberdrola building in Alameda Urquijo has been sold to a developer and has renewed the building now called "Edificio Echevarria" (the first two floors of the tower are occupied by the shop FNAC). In the meantime, demolition of part of the headquarters in Gardoki began in late 2007. Part of the workers ofIberdrola were moved to another building in Larraskitu.Excavation ended in April 2008, the first construction crane was installed on May 15th 2008, with a height of around 70 metres. Once the tower reaches its full height in 2010 the cranes will reach a height of 205 metres, the highest ever achieved by any structure in the Basque Country.
Companies involved
The following companies will be involved with the construction of the Iberdrola Tower:
* Architect:
César Pelli
* Developer: Promotora Vizcaina
* Real-state agents: Richard Ellis España, Apex Inmobiliaria
* Structural engineering: Idom
* Foundation companies: Terrabauer, Cimentaciones Abando
*Elevator supplier:Schindler Group External links
* [http://www.torreiberdrola.es/?idioma=en& Official website of the project.]
* [http://www.emporis.com/en/wm/bu/?id=198356 Emporis.com]
* [http://servicios.elcorreodigital.com/proyectos-bilbao/abandoibarra.html Information about Abandoibarra.]
Wikimedia Foundation. 2010.