- USS Thomas Stone (APA-29)
USS "Thomas Stone" (APA-29) was a "President Jackson"-class
attack transport that served with theUS Navy duringWorld War II . She was damaged in combat and consequently did not see out the war."Thomas Stone" (originally AP-59) was laid down under a
Maritime Commission contract (MC hull 58) as "President Van Buren" on 12 August 1941 atNewport News, Virginia , by theNewport News Shipbuilding and Drydock Company ; launched on 1 May 1941; and delivered to theAmerican President Lines on 11 September 1941. Thepassenger liner was acquired by the Navy on 14 January 1942; converted for use as atroop transport ; and commissioned on 18 May 1942, Capt. O. R. Bennehoff in command.ervice history
Operation Torch
"Thomas Stone" loaded troops at Norfolk and, on 26 September, sailed for
Ireland with Convoy AT 23. After calling at Halifax en route, she arrived atBelfast on 6 October. She disembarked her troops and then combat loaded men and equipment of the 9th Infantry Division for amphibious exercises off the coast ofScotland before getting underway for theClyde River on the 26th to participate inOperation Torch , the Allied invasion ofNorth Africa .Torpedoed
The transport was assigned the task of carrying troops for the British-controlled assault on Algiers. She transited the
Straits of Gibraltar on the night of 5 and 6 November. On the morning of the 7th, she was steaming on the left flank of the convoy, second in line astern of attack transport USS|Samuel Chase|AP-56)). At 0535, atorpedo hit the ship'sport side, aft, blowing a hole in her bottom; breaking her propeller shaft; and bending her propeller and herrudder tostarboard . The convoy continued on, leaving "Thomas Stone" behind, adrift some 150 miles from Algiers, guarded by only Britishcorvette HMS "Spey".Troops rescued
After daylight, an inspection of the damage revealed that the ship was in no immediate danger of sinking but was nevertheless unable to move under her own power. But Capt. Bennehoff and Major Walter M. Oakes, USA - who commanded the
battalion landing team embarked in "Thomas Stone" - were not content to let the transport's troops drift aimlessly in theMediterranean while others took Algiers. Besides, all on board the damaged ship were in deadly peril from a possible renewal of thesubmarine attack.To solve both problems, the two officers loaded most of the transport's troops in 24 boats which set out for Algiers Bay under the protection of "Spey". However, the weather which had been good when the boats left the transport worsened, and the frail craft began taking on water. Engine trouble forced the boats to be abandoned one by one and their crews and passengers were transferred to the corvette. When "Spey" finally reached Algiers before dawn on the 8th, she carried all of the crews of the boats and each of their passengers, for every boat had been scuttled. By the time "Spey"’s troops went ashore that morning, they learned that all French resistance had ended.
Towed to Algiers
Meanwhile, two destroyers, HMS "Wishart" and HMS "Velox", had arrived on the night of the 7th and attempted to tow "Thomas Stone". The next morning, HMS "St. Day", a tug, arrived to assist. Despite bad weather and the twisted remnants of the transport's rudder which made her all but unmanageable, the group of ships finally reached Algiers on the 11th and moored to the
Quai de Falaise where she discharged the remaining troops and equipment. On 19 November, "Thomas Stone" was moved to the outer harbor to make room for two large convoys.Attacked a second time
An air raid on the night of 24 and 25 November caused additional damage to the ship when a bomb pierced two decks, the hull, and exploded beneath her. On the 25th, a high wind and heavy swells caused the ship to drag both anchors and drove her hard aground, further damaging her hull. While still aground, the transport was reclassified attack transport APA-29 on 1 February 1943.
alvage attempts fail
Salvage operations continued for over a year, and all equipment and stores were removed. Efforts to refloat the ship continued until the spring of 1944, but the ship was finally placed out of commission on 1 April 1944, and her name was struck from the Navy list on 8 April 1944. Her hulk was sold to Le Material Economique, Algiers, for scrap. "Thomas Stone" received one
battle star forWorld War II service.References
* [http://www.hazegray.org/danfs/amphib/apa29.htm USS "Thomas Stone" (APA-29)] , DANFS Online.
* [http://www.navsource.org/archives/10/03/03029.htm APA-29 "Thomas Stone"] , Navsource Online.
Wikimedia Foundation. 2010.