Edwardsport is a 120-MW
coal -fired electrical power plant, and also a site where an integratedgasification combined cycle power plant (Edwardsport IGCC) is being constructed byDuke Energy at coord|38|48|24|N|87|14|49|W|display=inline,title near the city ofEdwardsport, In .The existing Units 1 and 2, rated at 45 and 75 MW respectively, were launched into service in 1949 and 1951. [cite web
title = Existing Electric Generating Units in the United States, 2006
work =
publisher =Energy Information Administration , U.S. Department of Energy
year = 2006
url = http://www.eia.doe.gov/cneaf/electricity/page/capacity/capacity.html
format = Excel
doi =
accessdate = 2008-07-14] They will be retired as the new 600-MW plant comes online. The new plant is slated to be a base-load station, capable of supplyingIndiana with additional capacity as it is needed in the future. The plant will also becarbon capture -ready.The
gasification process at the new plant involves convertingcoal into a combustiblesyngas that will be used in a combustion turbine. The exhaust gases are routed through a largeheat recovery steam generator that will be used in conjunction with asteam turbine to further increase the plant's efficiency.Edwardsport's pollution will be greatly reduced, as
particulate matter and mercury will be removed from thesyngas . The coal-derived synthetic gas is much cleaner than conventional coal combustion to begin with, and it is easier to clean to greater extent. Coal gasification allowscarbon capture to occur before the fuel is combusted — a much easier and economically feasible operation than carbon capture of exhaust gases.It is expected that Edwardsport IGCC will be online during