Arun Valley Line

Arun Valley Line
Arun Valley Line

Map of the Arun Valley Line
Overview
Type Heavy rail
System National Rail
Status Operational
Locale South East England
Termini Littlehampton
Three Bridges
Stations 11
Operation
Opened 1863
Owner Network Rail
Operator(s) Southern
Rolling stock Class 377 "Electrostar"
Technical
No. of tracks 2
Track gauge Standard gauge 1,435 mm (4 ft 8 12 in)

The Arun Valley Line, also known as the Mid Sussex Line, is part of the Southern-operated railway services. For the initial part of the route trains follow the Brighton Main Line, and at a junction south of Three Bridges the route turns westwards. It then runs via Crawley, Horsham (where there is a junction with the Mole Valley Line) and Arundel, before meeting the West Coastway Line at Arundel Junction. Trains on the Arun Valley Line then proceed to Portsmouth & Southampton.

[v · d · e]Arun Valley Line
Legend
Brighton Main Line
Continuation to left Station on transverse track Unknown BSicon "ABZ3lg" Continuation to right
Three Bridges
Station on track
Crawley-2nd station
Unknown BSicon "eHST"
Crawley-1st station
Stop on track
Ifield
Stop on track
Faygate
Unknown BSicon "eHST"
Roffey Road Halt Closed 1937
Stop on track
Littlehaven
Continuation backward Straight track
Mole Valley Line to London Victoria via Dorking
Track turning left Junction from right
Horsham Jnc
Station on track
Horsham
Bridge over water
River Arun
Straight track
Stammerham Junction
Unknown BSicon "ekABZgr" + Unknown BSicon "exvBHFc3 legende"
Christ's Hospital
Unknown BSicon "exCONTr" Unknown BSicon "exkABZr+r"
Straight track + Unknown BSicon "vBHFg legende" + Unknown BSicon "exkABZc3" + Unknown BSicon "exkABZc4"
Unknown BSicon "ekABZg+r"
to Guildford via Cranleigh Line
Unknown BSicon "eABZlf" Unknown BSicon "exSTRlg"
Itchingfield Junction
Straight track Unknown BSicon "exCONTf"
to Shoreham via Steyning Line Closed 1966
Stop on track
Billingshurst
Stop on track
Pulborough
Unknown BSicon "exCONTr" Unknown BSicon "eABZrf"
Hardham Jnc for Midhurst Closed
Stop on track
Amberley
Enter and exit tunnel
North Stoke Tunnel 83yds
Station on track
Arundel
Continuation to left Station on transverse track Unknown BSicon "ABZ3rf" Continuation to right
Ford
West Coastway Line Arundel Junction

Many stations on this line retain the short platforms which were originally built, not being extended by the Southern Railway when the line was modernized in the 1930s. This causes operational difficulties to this day, which require frequent platform and on-train announcements, telling passengers they must travel in the correct part of the train.

Contents

History

The line was opened in three stages by the London Brighton and South Coast Railway (LB&SCR) between 1848 and 1863, creating what was then known as Mid-Sussex route to Portsmouth.

Three Bridges - Horsham

A single track branch line was opened on 14 February 1848, with passing places at the intermediate stations at Crawley and Faygate. The line was doubled throughout in 1862. The stations now at Ifield and Littlehaven were not opened with the line, both being opened on 1 June 1907: Ifield as Lyons Crossing Halt and Littlehaven as Rusper Road Halt; both serving the outskirts of their nearby towns. An additional stop was opened at Roffey Road Halt, however this station was closed in the 1930s, as the land around was never built up (and still isn't to this day).

Horsham - Pulborough

The Midhurst Railways line from Horsham to Pulborough, Petworth and Midhurst was opened on 10 October 1859. The section from Hardham Junction to Midhurst was closed between 1964 and 1966. The Steyning Line from Horsham to Shoreham by Sea was opened on 1 July 1861 branching off at Itchingfield Junction south of Horsham. It closed in 1966.

Pulborough - Arundel

The line between Hardham Junction south of Pulborough, and Arundel Junction on the coast line via Arundel was finally opened on 3 August 1863 creating a through route to Portsmouth.

Originally, the main LB&SCR route from London to Portsmouth used the Sutton & Mole Valley Lines to Horsham. However, with the increase in demand at Gatwick Airport, the mainline services were re-routed in 1978 to serve the airport and then travel via Three Bridges.

Electrification

The line was electrified using the (750 V DC third rail) system by the Southern Railway in 1938 as part of the proposals to electrify the lines from London to Portsmouth. This originally only covered the section from Horsham to Littlehampton and Barnham, as the main line was the line through Epsom, as opposed to the line to Three Bridges, but plans were extended to electrify the "branch" as well in the same year.

Two bridges on the line, The Black Rabbit Bridge (just north of Arundel) and the Peppering Bridge (a few hundred yards further on) were replaced during the August Bank Holiday weekend of 2009. The line was completely closed to traffic during these major engineering works and a replacement bus service served stations between Arundel and Pulborough. As the two week Arundel Festival was drawing to a close over the weekend, Southern maintained a service into the station from the West Coastway Line from Bognor Regis via Barnham and Ford, and a reversal at Littlehampton.[1]

Services

There are currently two trains per hour on the route off-peak: Down Line services Both divide at Horsham, the train on the hour has a front portion which is fast to Barnham then onto Portsmouth Harbour. The rear portion is semi fast to Bognor Regis (not calling at Christ's Hospital and Amberley Stations) The 30min past train front portion again runs fast to Barnham then is semi fast to Southampton Central. The rear section calls all stations to Bognor Regis. The Up line service. Again two trains an hour, both services attach at Horsham. The Bognor Regis section always arrives first unless there is disruption and then a section from either Portsmouth Harbour or Southampton Central arrives. Once the train has attached it runs semi fast to London Victoria via the Horsham Branch Line (Horsham to Three Bridges). Each of the up services arrive with normally a 10 minute interchange for the stopping services to London Bridge and the one closest the hour for the Mole Valley service towards Dorking.

Typical off-peak journey times from London Victoria (via Redhill and Gatwick Airport)

Based on December 2006 timetable.
Stations in italics are served by through trains but are not part of the Arun Valley Line.

Destination Frequency Stopping service Semi-fast service Change for
Clapham Junction 2 train/h 6 minutes 6 minutes Wimbledon, Woking, Guildford, Reading
East Croydon 2 train/h 16 minutes 16 minutes Tramlink, London Bridge, Caterham, Tattenham Corner
Redhill 2 train/h 29 minutes 29 minutes Reigate, Guildford, Edenbridge, Tonbridge
Gatwick Airport 2 train/h 39 minutes 37 minutes
Three Bridges 2 train/h 44 minutes 42 minutes Haywards Heath, Brighton, Eastbourne, Worthing
Crawley 2 train/h 47 minutes 45 minutes
Horsham 2 train/h 56 minutes 54 minutes Dorking, Leatherhead, Epsom, Sutton
Christs Hospital 1 train/h 1 hour
Billingshurst 2 train/h 1 hour 6 minutes 1 hour 2 minutes
Pulborough 2 train/h 1 hour 13 minutes 1 hour 8 minutes
Amberley 1 train/h 1 hour 20 minutes
Arundel 2 train/h 1 hour 25 minutes 1 hour 17 minutes
Ford 1 train/h 1 hour 30 minutes Littlehampton, Worthing, Brighton
Barnham 2 train/h 1 hour 34 minutes 1 hour 28 minutes Bognor Regis, and also Littlehampton, Worthing, Brighton (Ford has reduced service)
Chichester 2 train/h 1 hour 46 minutes 1 hour 36 minutes Havant, Portsmouth Harbour, Southampton Central

Typical off-peak journey times from London Bridge (via Redhill and Gatwick Airport)

Based on December 2006 timetable. Stations in italics are served by through trains but are not part of the Arun Valley Line. There are two trains per hour on this route. Some stations between London Bridge and Gatwick Airport have been omitted. Faygate is served during peak hours only.

Destination Off-peak journey time Change for
East Croydon 16 minutes Tramlink, London Victoria, Caterham, Oxted
Redhill 36 minutes Reigate, Guildford, Edenbridge, Tonbridge
Gatwick Airport 50 minutes
Three Bridges 56 minutes Haywards Heath, Brighton, Eastbourne, Worthing
Crawley 1 hour
Ifield 1 hour 3 minutes
Littlehaven 1 hour 9 minutes
Horsham 1 hour 14 minutes Dorking, Leatherhead, Epsom, Sutton

Bibliography

References

External links

Coordinates: 51°07′01″N 0°09′40″E / 51.117°N 0.161°E / 51.117; 0.161


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Medway Valley Line — Railways in Kent Overview Type Suburban rail, Heavy rail System National Rail …   Wikipedia

  • Cherwell Valley Line — Appleford railway station, on the Cherwell Valley Line. Overview Type Heavy rail …   Wikipedia

  • Cranleigh Line — [v · d · …   Wikipedia

  • Sutton & Mole Valley Lines — The Sutton Mole Valley Lines are a group of railway lines constructed between 1847 and 1868 by the London, Brighton and South Coast Railway, the London and South Western Railway and the LBSCR sponsored Horsham, Dorking and Leatherhead Railway.The …   Wikipedia

  • Cotswold Line — Overview Type Rural, Heavy rail System National Rail …   Wikipedia

  • Chiltern Main Line — Chiltern Railways Clubman at West Ruislip Overview Type Commuter rail, Heavy rail S …   Wikipedia

  • Oxted Line — The Oxted Lines, shown with other railway lines in South London, Surrey, Kent and East Sussex. Overview Type Commuter rail, Suburban rail …   Wikipedia

  • Varsity Line — [v · d · …   Wikipedia

  • Tattenham Corner Line — A 1905 Railway Clearing House map of the Tattenham Corner Line and surrounding lines. Overview Type Commuter r …   Wikipedia

  • Marston Vale Line — Overview Type Heavy rail System National Rail Status Operational Locale Buckinghamshire Bedfordshire …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”