- Hongyanhe Nuclear Power Plant
Infobox NPP
Picture =
Pic_des =
Type = CPR-1000
Country =People's Republic of China
Utility = Liaoning Hongyanhe Nuclear Power Co. Ltd
Built =
Start =June 28 ,2007
End =
Reactor =
Reactor_MW =
S_Reactor =
S_Reactor_MW =
B_Reactor = 2
B_Reactor_MW = 2,160
P_Reactor = 4
P_Reactor_MW = 4,240
El_Prod = 0
for_year =
El_Prod_avg =
Net_Prod = 0
WEBSITE =
as_of = 2007TheNuclear power station Hongyanhe is one of the newest NPP projects in the world as of 2007. It is located inHongyanhe in theDonggang Town ofWafangdian in theLiaoning Province ofChina , 104 km north ofDalian City . Construction is underway on the first two of 6 units total units. Exact construction schedule of the entire plant is not fully known yet.Technology and various parts of the construction will be provided by
Areva with a design based of the plants in Ling'ao and Daya Bay.Progress
The project was approved by the
National Development and Reform Commission in April 2006, and projected to cost 23 billionyuan ($2.88 billion USD). The cost will be shared between theChina Power Investment Corporation , theChina Guangdong Nuclear Power Group Holdings Co. Ltd and two Liaoning companies. Liaoning Hongyanhe Nuclear Power Co. Ltd is managing the construction and will be the operator of the plant once it goes online.Construction started in summer of 2007 with excavation of two large holes that will have the reactors put in them and a containment built around them. [ [http://www.china.org.cn/english/2006/Jul/173330.htm Construction Starts on Hongyanhe Nuclear Power Plant - china.org.cn ] ] These two reactors represent the first phase of the construction, to be succeeded by a phase 2 and 3 for the remaining 4 reactors.
First concrete poured is exptected to be in September 2008. It is expected that these two will go into commercial operation in 2012 and will contribute to a Chinese plan to rejuvenate an old industrial base in the northeast of the country.
ee also
*
Nuclear power in China References