Wendlingen-Ulm high-speed line is a proposed
high-speed rail way line crossing theSwabian Alb with speeds of up to 250 km/h and will run in many sections parallel to the A 8. In the east the line will connect with theNeu-Ulm station opened on18 March 2007 , in the west to theStuttgart 21 project.As a section of the
Stuttgart–Augsburg new and upgraded line , the Wendlingen-Ulm project is also a component of theMagistrale for Europe fromParis toBudapest , which is supported by theEuropean Union as part of itsTrans-European Networks . The European Union is providing up to 50 per cent of the planning phase of the project and is expected to fund ten per cent of its construction costs.Project
Once opened, the travel time for high-speed traffic between
Stuttgart andUlm will be only 28 minutes rather than the current 54 minutes, if a stop atStuttgart Airport is omitted. This is part ofDeutsche Bahn 's "Netz 21" (network 21) concept, which envisages a reduction of the travel time betweenFrankfurt andMunich from over three and a half today to only two and a half hours in the future. However, this timing can only be achieved with a by-pass ofMannheim on the proposedRhein/Main–Rhein/Neckar high-speed rail line , which would allow the travel time between Frankfurt and Stuttgart to be reduced to one hour. Deutsche Bahn has shelved the proposed bypass because of opposition to it in Mannheim.27.1 km of the 58 km new line run in seven twin-tube tunnels. The estimated construction cost of
€ 2 billion, is affected by the difficult geology that the tunnels will run through. [ [http://www.stuttgarter-nachrichten.de/stn/page/detail.php/1261473 27 Kilometer Tunnel durch schwieriges Gestein] , "Stuttgarter Nachrichten" of4 October 2006 de icon]Sections
The project is divided into seven planning sections:
*"Section 2.1 a/b " connectsWendlingen with section 1.4 of the Stuttgart 21 project.
*"Section 2.1 c (Albvorland: Alb foothills)" runs parallel with the A8, including the 8.3 km-long Albvorland tunnel.
*"Section 2.2 (Albaufstieg: Alb ascent)" consists mainly of the approximately 8.8 km for the Bossler tunnel, two approximately 480 m-long bridges over the Fils valley and the approximately 4.8 km-long Steinbühl tunnel.
*"Section 2.3 (Albhochfläche: Alb highlands)" runs above ground and parallel to the A8.
*"Section 2.4 (Albabstieg: Alb descent)" runs through a tunnel into the city ofUlm .
*The integration of the line with Ulm station is carried out in "Section 2.5 a1".
* Finally "Section 2.5 a2 (Danube bridge)" connects to the Neu-Ulm 21 project.Construction timetable
In May 2005 it was decided to commence construction. Under the plans of
DB ProjektBau (Deutsche Bahn’s construction subsidiary), if construction had commenced in autumn 2005, it would have been ready to open in 2013. However, as a result of Federal Budget cuts commencement of construction has been delayed. OnJuly 19 2007 , it was announced by the Federal Government, the State ofBaden-Württemberg and DB that the project had been officially approved. € 2.0 billion will be invested in the Wendlingen-Ulm high-speed line, along with € 2.8 billion in Stuttgart 21. Baden-Württemberg agreed to provide funds of € 950 million for the Wendlingen-Ulm line, but the Federal Government will not provide funding for it before 2016. This agreement is expected to bring forward the commencement of construction from 2016 to 2010 and completion to 2020. cite news
title =Einigung auf Finanzierung von Stuttgart 21
language =German
publisher =SWR3 Radio news
date =19 July 2007
url =http://www.swr.de/nachrichten/bw/-/id=1622/nid=1622/did=2387316/pyrcro/index.html
accessdate = 2007-07-20 ] cite news
title =Finanzierung für Stuttgart 21 steht
work =
pages =
language =German
publisher =Spiegel online
date =19 July 2007
url =http://www.spiegel.de/reise/aktuell/0,1518,495398,00.html
accessdate = 2007-07-20 ] cite press release
title =Tiefensee: Durchbruch für die Neubaustrecke Stuttgart - Ulm - Augsburg und "Stuttgart 21"
publisher =Federal Ministry of Transport, Building and Urban Affairs
date =19 July 2007
url =http://www.bmvbs.de/-,302.1003300/Tiefensee-Durchbruch-fuer-die-.htm
language =German
accessdate = 2007-07-20 ] [cite web
title = Memorandum of Understanding
work =
publisher =Federal Ministry of Transport, Building and Urban Affairs
date =19 July 2007
url =http://www.bmvbs.de/Anlage/original_1003311/Memorandum-of-Understanding.pdf
format =pdf
doi =
language =German
accessdate = 2007-07-20 ]Notes
References
*de|Neu- und Ausbaustrecke Stuttgart–Augsburg
External links
* [http://www.db.de/site/bahn/de/unternehmen/bahnwelt/bauprojekte/ausbau__neubau/stuttgart__ulm.html Deutsche Bahn –Stuttgart–Ulm new line] de icon
* [http://www.stuttgarter-nachrichten.de/media_fast/631/0410_loka_4csulmfi.pdf Route map] "Stuttgarter Zeitung" de icon
Wikimedia Foundation. 2010.