IEC 60870-5-104

IEC 60870-5-104

IEC 60870-5-104 (IEC 104) protocol is an extension of IEC 101 protocol with the changes in transport, network, link & physical layer services to suit the complete network access. The standard uses an open TCP/IP interface to network to have connectivity to the LAN (Local Area Network)and routers with different facility (ISDN, X.25, Frame relay etc) can be used to connect to the WAN (Wide Area Network). Application layer of IEC 104 is preserved same as that of IEC 101 with some of the data types and facilities not used. There are two separate link layers defined in the standard, which is suitable for data transfer over Ethernet & serial line (PPP - Point-to-Point Protocol).

Additional Synchronization Mechanisms

Control field data of IEC104 contains various types of formats /mechanisms for effective handling of network data synchronization

1. I Format – It is used to perform numbered information transfer. It contains send-sequence number and receive-sequence number. The transmitter station increases send-sequence number when it sends any data and receiver increases receive-sequence number when it receives any data. The sending station has to hold the send APDUs in the buffer until it receives back the send sequence numbers as the receive sequence number from destination station.

2. S Format – It is used to perform numbered supervisory functions. In any cases where the data transfer is only in a single direction, S-format APDUs has to be send in other direction before timeout (t2), buffer overflow or when it has crossed maximum number of allowed I format APDUs without acknowledgement (w).

3. U Format – It is used to perform unnumbered control functions. This is used for activation and confirmation mechanisms of STARTDT (start data transfer) & STOPDT (stop data transfer) & TESTFR (test APDU).

4. Test Procedure – Open but unused connections must be tested periodically (when it has crossed ‘t3’ after the last message) by sending TESTFR frames, which need to be acknowledged, by the destination station. The connection needs to be closed when there is no reply for the test message after timeout (t1) or when there are more numbers of I-format APDUs than the specified ‘k’.

ee also

* IEC 60870-5
* IEC 60870-5-101
* IEC 60870-5-103
* IEC 61850
* DNP3

External links

* [http://www.trianglemicroworks.com/documents/DNPvs870.pdf Comparison of DNP and IEC 60870-5]

* [http://www.nettedautomation.com/news/n_44.html Protocol Comparisons - IEC101, IEC104, IEC61850 ]

* [http://www.trianglemicroworks.com/iec60870-5/index.htm IEC 60870-5 User Group Mail list]

* [http://www.trianglemicroworks.com/ProductPage.htm Commercially available IEC 60870-5-104 Source Code Library, OPC Client/Server, Protocol Gateway and Test Tools]

* [http://www.kalkitech.com/iec.htm IEC 60870-5-104 Solutions]

* [http://www.kalkitech.com/protocolgateways.htm IEC 60870-5-104 Protocol Converter & Gateway]


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • IEC 60870-5-104 — DIN EN 60870 Bereich Netztechnik Regelt Fernwirkeinrichtungen und systeme (mehrere Teile) Kurzbeschreibung …   Deutsch Wikipedia

  • IEC 60870-5-101 — IEC 101 (IEC 60870 5 101) es una norma internacional preparada por TC57 para la monitorización de los sistemas de energía, sistemas de control y sus comunicaciones asociadas. Es totalmente compatible con las normas IEC 60870 5 1 y IEC 60870 5 5 y …   Wikipedia Español

  • IEC 60870-5 — provides a communication profile for sending basic telecontrol messages between two systems, which uses permanent directly connected data circuits between the systems. The IEC Technical Committee 57 (Working Group 03) have developed a protocol… …   Wikipedia

  • IEC 60870-5-101 — (IEC101) is an international standard prepared by TC57 for power system monitoring, control associated communications. This is completely compatible with IEC 60870 5 1 to IEC 60870 5 5 standards and uses standard asynchronous serial tele control… …   Wikipedia

  • IEC 60870-5-103 — [IEC103] is a standard prepared by International Electrotechnical Commission Technical committee 57 for power system control and associated communications. It defines a companion standard that enables interoperability between protection equipment …   Wikipedia

  • IEC 60870 — DIN EN 60870 Bereich Netztechnik Titel Fernwirkeinrichtungen und systeme (mehrere Teile) Letzte Ausgabe …   Deutsch Wikipedia

  • IEC 60870-5 — DIN EN 60870 Bereich Netztechnik Regelt Fernwirkeinrichtungen und systeme (mehrere Teile) Kurzbeschreibung …   Deutsch Wikipedia

  • IEC 60870-5-101 — DIN EN 60870 Bereich Netztechnik Regelt Fernwirkeinrichtungen und systeme (mehrere Teile) Kurzbeschreibung …   Deutsch Wikipedia

  • IEC 60870-5-102 — DIN EN 60870 Bereich Netztechnik Regelt Fernwirkeinrichtungen und systeme (mehrere Teile) Kurzbeschreibung …   Deutsch Wikipedia

  • IEC 60870-5-103 — DIN EN 60870 Bereich Netztechnik Regelt Fernwirkeinrichtungen und systeme (mehrere Teile) Kurzbeschreibung …   Deutsch Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”