Rough Cut Capacity Planning

Rough Cut Capacity Planning

Rough Cut Capacity Planning (RCCP) is a term used in relationship with production planning and controlling an environment. (RCCP) is also an important part of the manufacturing process within a companies Supply Chain by evaluating capacity with availability within a companies manufacturing environment.

Here is an example of how Supply Chain related activities relate to one another.

Forecasting of demand, Bill of Materials, along with Customer Orders are tied into a Master Production Schedule. A Master Production Schedule (MPS) is what a company uses to determine how many products to make for a given period of time. From the master production schedule is where the Rough Cut Capacity Planning (RCCP) comes into play. Following this is the Material requirements planning, ending with the Capacity Requirements Planning (CRP)

Now a company using this system could be a make to stock (MTS) or a make to order (MTO) company depending on the needs of a customer. There are also many factors that need to be included in an MPS known as Lead time, Safety Stock, Inventory levels, order policies such as lot for lot (LFL) or certain quantified amounts, as well as Carrying charge.

A repeating occurrence of an abundance amount of inventory being created or pulled through a supply chain application has become a problem. This abundance of inventory creates more finished goods, which in turn add higher carrying costs applied to the goods, as opposed to their raw state. To solve this problem, RCCP has been implemented in an MRP system to prevent an over production of materials and determining the appropriate amount of capacity that should be used in the system.


Wikimedia Foundation. 2010.

Игры ⚽ Нужен реферат?

Look at other dictionaries:

  • «Черновое» (укрупненное) планирование мощностей (ROUGH-CUT CAPACITY PLANNING, RCCP)  — Процесс преобразования объемно календарного плана на основе потребности в ключевых ресурсах, часто включая трудозатраты, оборудование, складское пространство, потенциал поставщиков и, в некоторых случаях, денежные средства. Для каждого ключевого… …   Словарь терминов по управленческому учету

  • Advanced Planning \x26 Scheduling — Advanced Planning Scheduling APS (сокр. от англ. Advanced Planning Scheduling усовершенствованное планирование) концепция оптимизированного (или синхронного) производственного планирования, главной особенностью которой является возможность… …   Википедия

  • Advanced Planning & Scheduling — APS (сокр. от англ. Advanced Planning Scheduling усовершенствованное планирование) концепция производственного планирования, главной особенностью которой является возможность построения расписания работы оборудования в рамках всего предприятия.… …   Википедия

  • Advanced Planning & Scheduling — APS (сокр. от англ. Advanced Planning Scheduling усовершенствованное планирование) концепция оптимизированного (или синхронного) производственного планирования, главной особенностью которой является возможность быстрого составления планов с… …   Википедия

  • Material requirements planning — (MRP) is a production planning and inventory control system used to manage manufacturing processes. Most MRP systems are software based, while it is possible to conduct MRP by hand as well. An MRP system is intended to simultaneously meet three… …   Wikipedia

  • Планирование потребности в производственных мощностях (CAPACITY REQUIREMENTS PLANNING, CRP)  — Функция планирования, предназначенная для определения, измерения и коррекции необходимых ограничений мощности или уровней мощности. Данный термин в MRP II относится к процессу детального определения количества труда и производственных ресурсов,… …   Словарь терминов по управленческому учету

  • ГОСТ Р ИСО 15531-1-2008: Промышленные автоматизированные системы и интеграция. Данные по управлению промышленным производством. Часть 1. Общий обзор — Терминология ГОСТ Р ИСО 15531 1 2008: Промышленные автоматизированные системы и интеграция. Данные по управлению промышленным производством. Часть 1. Общий обзор оригинал документа: 3.6.49 временная модель (time model): Модель характеристики… …   Словарь-справочник терминов нормативно-технической документации

  • планирование — 3.25 планирование: Вид управленческой деятельности, связанный с определением целей управляемой системы. Источник: СТО Газпром 7 2005: Структура управления. Полномочия и ответственность в системе менеджмента охраны окружающей ср …   Словарь-справочник терминов нормативно-технической документации

  • планирование потребности в производственных мощностях — Функция планирования, предназначенная для определения, измерения и коррекции необходимых ограничений мощности или уровней мощности. Данный термин в MRP II относится к процессу детального определения количества труда и производственных ресурсов,… …   Справочник технического переводчика

  • планирование требований к ресурсам; планирование резкого сокращения производительности — 3.6.44 планирование требований к ресурсам; планирование резкого сокращения производительности [resources requirements planning; rough cut capacity planning (RCCP)]: Процесс приведения производственного плана и/или производственного графика в… …   Словарь-справочник терминов нормативно-технической документации

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”