- Pen-y-Mount railway station
Infobox UK station
name = Pen-y-Mount
caption =
manager = WHR Ltd
locale =Porthmadog
borough =Gwynedd
latitude = 52.93415
longitude = -4.12392
lowusage0203 = 0.0
lowusage0405 = 0.0
lowusage0506 = 0.0
platforms = 1
years = 1980
events = Opened
years1 = 2007
events1 = Line north opened to Traeth MawrPen-y-Mount station was the northern terminus of the WHR(P). It opened on the
2 August 1980 . At that time it consisted of a single platform with a run round loop and was intended to be a temporary terminus.In
1990 a siding was laid into the yard for works trains. After theFfestiniog Railway gained the authority to rebuild the WHR, it was decided to turn Pen-y-Mount station into a representation of a typical WHR station.In
1996 a replica WHR corrugated iron station building was constructed. Its design is based upon the originalNantmor railway station . Subsequently genuine WHR fencing, including akissing gate , was erected along the back of the platform.In
2002 the northern end was remodeled, with the existing headshunt being replaced with a full crossover onto the future Ffestiniog line, and a new headshunt loading spur cite web |url=http://www.pontcroesor.co.uk/pym.htm |title=Pont Croesor Extension project ] .In
2004 a siding was laid along the line of the future line to Harbour Station, this is known as the 'Harbour Siding'. This has seen extensive use during the building of the line toTraeth Mawr Loop , with rail and ballast being loaded from it. The siding has beem removed during the construction of the junction railway to Porthmadog Harbour being built ] .In
2007 the line north toTraeth Mawr Loop was opened, and Pen-y-Mount stopped being a terminus. For the season only, it operated using this loop. For 2008 it will operate as a push pull train to the southern most section of the loopDuring the
2007 Christmas work party a start was made on building the new down platform.Once the rebuilding of the railway is complete in 2009 Pen-y-Mount will become a junction, with lines to
Beddgelert , and both Porthmadog Termini.References
External links
* [http://www.penymount.co.uk/ Pen-y-Mount Station website]
* [http://www.vols.whr.co.uk/air/pym.jpgAerial Photograph 2003]
* [http://www.frheritage.org.uk/wiki/Pen-y-Mount_Station FR Heritage Group Wiki]rail line one to two
previous = Stnlnk|Pont Croesor
route1 =Welsh Highland Railway
next1 =Gelert's Farm halt
route2 = Porthmadog Cross Town Link
(under construction)
next2 = Harbour Station