- Akhmeteli-Varketili Line
The Akhmeteli-Varketili (formerly known as Didube-Samgori and Gldani-Varketili) is a line of the
Tbilisi Metro . The line was part of the first stage of the Metro and currently cuts the city on a north-south axis. The line currently has 16 stations and 19.6 kilometres of track.History
Rolling stock
The line is served by the Nadzladevi depot (№1), currently 19 four carriage trains are assigned to it. A mix of Е, Еzh3, Еma-502, Еm-508T as well as the newer 81-714.5, 81-717.5. All of the trains are undergoing major repairs and there is also a large carriage reserve park.
Recent developments and future plans
Due to the fact that some of the stations have been operative for over four decades, as well as neglect caused by the lack of funding during the 1990s, most of them require a major facelift and some severe repairs on hydroisolation and structure. Recently there has been progress in both directions. There are unconfirmed proposals of additional proposals, but so far Tbilisi has other projects to be realised.
Wikimedia Foundation. 2010.