Yorkshire and Humber Route Utilisation Strategy

Yorkshire and Humber Route Utilisation Strategy

The Yorkshire and Humber Route Utilisation Strategy is a Route Utilisation Strategy (RUS), published by Network Rail in July 2009 [1]; it was the twelfth RUS to be completed, not counting the partially completed Network RUS.

By default, RUSs are established by the Office of Rail Regulation (ORR) unless the latter objects within 60 days. The RUS is included in NR's map as established [2].

The scope corresponds roughly with Strategic Routes 10 (North Cross-Pennine, North and West Yorkshire [3]) and 11 (South Cross-Pennine, South Yorkshire and Lincolnshire [4]).

The Y&H RUS picked up several issues from other RUSs, specifically:

Issues in the Y&H RUS were also relevant to the East Midlands RUS (in draft as at early November), mainly at Chesterfield and in Lincolnshire.

As with other RUSs, the Y&H RUS took into account a number of responses[5][6][7], including the Office of Rail Regulation (ORR) [8].

The routes and services covered by the RUS are varied in type. Many lines are used for passenger services with very little, if any, freight; some lines on the other hand are largely for freight. A number of passenger transport executives (PTEs) have significant influence over transport planning in the area.

Some issues were passed to the Network RUS, Electrification workstream.

The RUS needs to be seen against existing contingent and prospective schemes, particularly in Control Period 4.

Groups of gaps and issues

The RUS identifies generic groups of gaps and issues

  • Peak crowding Overcrowding on peak time trains, especially into Leeds and Sheffield
  • Off-peak crowding Overcrowding between the peaks, possibly leading to suppression of demand
  • Engineering access Closure of routes for engineering access, possibly leading to suppression of demand
  • Regional links Connectivity within the RUS area, and between the RUS and external areas
  • Freight capability Lack of availability owing to inadequacy of diversionary routes, route availability, loading gauge and/or capacity
  • Reactionary delays Reactionary delays contributing to poor performance.

A number of routes and services suffer from overcrowding of passengers in each usually 3-hour peak periods (mostly divided into a middle 'high' peak hour and two 'shoulder' peaks). In almost all cases these problems are foreseen, in the absence of interventions, to get worse owing to forecast growth in passenger traffic. These are simply referred to as "peak crowding" in the detail below.

Subsequent developments

In March 2009 Network Rail published its CP4 Delivery Plan 2009, including Enhancements programme: statement of scope, outputs and milestones [9], confirming most of the recommended interventions. Specific projects, scheduled to cost about one billion pounds in total, with their reference and page numbers in the document, are given below:

  • 03.05 Strategic Freight Network, Train lengthening projects fund, regarding Hope Valley, p24
  • 18.01 Capacity relief to the ECML (GN/GE Joint Line), pp94-95
  • 18.07 York Holgate Junction 4th line, p106
  • 18.08 Shaftholme Junction re-modelling, pp107-108
  • 19.00 Overhead line electrification refurbishment, pp111-112
  • 23.00 Northern urban centres - Yorkshire, p125
  • 23.01 Capacity improvements (Leeds area), pp126-8
  • 23.02 South Yorkshire - train lengthening, p129
  • 23.03 South Yorkshire - stabling for Northern, p130
  • 25.00 Trans-Pennine line speed improvements, p137

References


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Lancashire and Cumbria Route Utilisation Strategy — The Lancashire and Cumbria Route Utilisation Strategy is a Route Utilisation Strategy, published by Network Rail on 29 August 2008 [1] It was the ninth RUS to be produced. By default, RUSs are established by the Office of Rail Regulation (ORR)… …   Wikipedia

  • Route Utilisation Strategy — Not to be confused with Network Route Utilisation Strategy. Network Rail (NR) has an obligation, transferred from the abolished Strategic Rail Authority, to periodically produce Route Utilisation Strategy (RUS) documents.[1] The current programme …   Wikipedia

  • East Coast Main Line Route Utilisation Strategy — The East Coast Main Line Route Utilisation Strategy is a Route Utilisation Strategy (RUS), published by Network Rail in February 2008 [1][2][3] It was the seventh RUS to be produced. By default, RUSs are established by the Office of Rail… …   Wikipedia

  • North West Route Utilisation Strategy — The North West Route Utilisation Strategy (NWRUS) is a Route Utilisation Strategy, published by Network Rail in May 2007.[1][2] It was the fifth RUS to be produced. It was included in a map published by the Office of Rail Regulation as… …   Wikipedia

  • Network Rail Route Utilisation Strategies — Network Rail has an obligation, transferred from the abolished Strategic Rail Authority, to produce Route Utilisation Strategies [http://www.networkrail.co.uk/browseDirectory.aspx?root= pageid=2895 dir=RUS%20DocumentsRoute%20Utilisation%20Strategi… …   Wikipedia

  • Northern Rail — Franchise(s) …   Wikipedia

  • Midland Main Line — This article is about the railway line. For the former train operating company, see Midland Mainline. Midland Main Line East Midlands Trains HST at Dore. Overview …   Wikipedia

  • East Coast Main Line — ECML redirects here. For the European Conference on Machine Learning, see ECML PKDD. East Coast Main Line An InterCity 225 on the East Coast Main Line Overview Type …   Wikipedia

  • Skipton railway station — Infobox UK station name = Skipton manager = Northern Rail locale = Skipton borough = Craven platforms = 4 caption = owner = Network Rail code = SKI usage0203 = 0.655 usage0405 = 0.761 usage0506 = 0.794 usage0607 = 0.817 years = 1847 events =… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”