Eurotunnel Class 9

Eurotunnel Class 9

The Eurotunnel Class 9 Bo-Bo-Bo electric locomotives were built by Brush Traction between 1993 and 2002. They are used to haul the Eurotunnel Shuttle service through the Channel Tunnel between Cheriton and Coquelles.

Overview

The Bo-Bo-Bo wheel arrangement is unusual, yet offers the adhesion of 12 wheels (equivalent to a Co-Co) with flexibility that 4-wheeled bogies give. The flexibility is required as they have to negotiate 180-degree curves at both terminals, and the middle bogie has side play to allow this.

The class were built by Brush Traction at Loughborough and receive heavy maintenance there. To get to the Brush Works they must travel by road since they are built to the Berne gauge and are too large for British loading gauge.

They operate as two locomotives per train, one at either end, hauling the Eurotunnel rolling stock. For safety reasons each is capable of hauling a train by itself should the other one fail, and a full set can also push out another failed Shuttle or a failed Eurostar or Freight train. In addition, much of the equipment on the locomotives is duplicated to reduce the chance of failure, and they are divided into fireproof compartments.

Common with UK and French practice, the driver sits on the left hand side of the cab, and the right hand side of the cab is used by the train manager, who travels in the rear locomotive and is also a fully qualified driver and capable of driving the train out of the tunnel in an emergency. Early locomotives were fitted with a second small cab at the inner end, for use when shunting at the depots, but these were not fitted to later locomotives.

They are fitted with TVM 430 in-cab signalling. They take power from 25 kV 50 Hz AC overhead line electrification.

The design was based on the NZR EF class locomotives used in New Zealand, which were also built by Brush, Loughborough. The proven EF design was scaled up from New Zealand's RailGauge|1067|al=on|lk=on and small loading gauge, to the standard rail gauge and larger loading gauge used in Europe. See Semmens, page 16-18.

The Class 9s handle only the Eurotunnel Shuttle services; British Rail Class 92 electric locomotives haul normal freight trains through the tunnel.

Subclasses

Several subclasses of locomotive have been built, summarised below.

Names

The locomotives are named after opera singers. There is a complete list [http://www.therailwaycentre.com/Nemeplates/Book_PDFs/Eurotunnel.pdf here.]

References

Semmens, P.W.B. and Machefest-Tassin, Y. (1994) "Channel Tunnel Trains: Channel Tunnel rolling stock and the Eurotunnel system", Folkestone : Channel Tunnel Group, ISBN 1-872009-33-6


Wikimedia Foundation. 2010.

Игры ⚽ Нужен реферат?

Look at other dictionaries:

  • Eurotunnel Class 0001 — The Eurotunnel Class 0 Bo Bo diesel locomotives were built by Maschinenbau Kiel (MaK, now Vossloh s Motive Power Dept.) between 1992 and 1993. They are very similar to the NS 6400 Class.Five locomotives were built, numbered 0001 0005. They carry… …   Wikipedia

  • Eurotunnel Class 0031 — The Eurotunnel Class 0 0 4 0 diesel locomotives were built by Hunslet Engine Company between 1989 and 1990. They were built as 900 mm gauge, but were rebuilt to standard 4 foot 8½ inch gauge (1435 mm metric) by Schöma in Germany between 1993 and… …   Wikipedia

  • Eurotunnel Shuttle — (previously known as Le Shuttle) is a shuttle service between Calais/Coquelles in France and Folkestone in the UK. It conveys road vehicles through the Channel Tunnel. Passenger and Freight vehicles are carried in separate shuttle trains.The… …   Wikipedia

  • Class 9 — Class 9, Class 09 and Class IX may refer to: BR Standard Class 9F, a steam locomotive class of the United Kingdom British Rail Class 09, a diesel locomotive class of the United Kingdom Eurotunnel Class 9, an electric class locomotive GCR Class 9F …   Wikipedia

  • Eurotunnel — This article is about the Eurotunnel company. : Not to be confused with the Channel Tunnel describing the underground infrastructures. Eurotunnel plc (in the UK) and Eurotunnel SA (in France) make up the Eurotunnel Group, founded in August 1986,… …   Wikipedia

  • Eurotunnel Folkestone Terminal — Folkestone Terminal Eurotunnel Shuttle vehicle transport terminal Lorries wait to board a freight shuttle Station statistics …   Wikipedia

  • Eurotunnel Shuttle — Départ d une rame fret à Coquelles La Navette d Eurotunnel est le nom d un service de ferroutage exploité par la société Eurotunnel dans le tunnel sous la Manche. Ce service, qui fonctionne entre les terminaux de Calais/Coquelles (France) et… …   Wikipédia en Français

  • NS Class 6400 — Railion 6418 John (2009) Builder MaK / ABB Build date 1988 94[1] …   Wikipedia

  • NZR EF class — Three EF locomotives on a freight train north of Feilding. Power type Electric Builder Brush Traction, Loughborough …   Wikipedia

  • Navette d'Eurotunnel — Eurotunnel Le Shuttle est un service de ferroutage exploité par la société privée Eurotunnel dans le tunnel sous la Manche. Ce service, qui fonctionne entre les terminaux de Calais/Coquelles (France) et Folkestone (Angleterre), comprend deux… …   Wikipédia en Français

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”