- Avon River (Nova Scotia)
Infobox River
river_name = Avon River
caption = Avon River, Nova Scotia
origin =
mouth =Minas Basin
basin_countries =Canada
length = 64 km
elevation =
mouth_elevation =sea level
discharge =
watershed = :"This is about a river in Nova Scotia. For other rivers of the same name seeRiver Avon "The Avon River is a small Canadianriver in centralNova Scotia .A northerly flowing river, the Avon River flows rises on South Mountain, southwest of the town of Windsor. Its meander length is convert|64|km|mi|abbr=on. [ [http://www.bartleby.com/69/81/A08881.html "Columbia Gazeteer"] ] Near the rural community of Martock, the river enters a broad glacial river valley forming a
ria [ [http://museum.gov.ns.ca/mnh/nature/nhns2/500/fig16.htm Schematic drawing and description] ] ) where it becomes tidal, creating anestuary for its remaining route to theMinas Basin several kilometres downriver from the town of Hantsport.Rivers flowing into the Avon include the Herbert, Cogmagun, Kennetcook and St. Croix.
Causeway and controversy
In 1970 the Avon River was completely obstructed by a rock and earth fill
causeway immediately downstream from Windsor at its junction with the St. Croix River as part of the development of a controlled access expressway called Highway 101.The Avon River Causeway replaced an existing road bridge upriver from town and also resulted in the rerouting of the
Dominion Atlantic Railway 's Halifax-Yarmouth main line which used to run through Windsor's downtown, crossing the river on a bridge parallel to the road bridge immediately upriver from the town.The causeway controls the Avon River's discharge and the incoming tidal waters of the Minas Basin through a series of flood control gates which are intended to regulate the river's flowage to prevent flooding of agricultural lands upriver near Martock. The section of the Avon River upriver of the causeway along the Windsor waterfront is now the freshwater Pesaquid Lake.
The construction of the causeway has dramatically affected the Avon River downstream from Windsor, with large parts of the once-navigable river now being obstructed by large mud flats and vegetation, owing to the lack of tidal exchange and freshwater discharge. The nature writer Harry Thurston has noted, "Almost before the last stone was put in place, sediment began to accumulate to an alarming rate - 5 to 14 centimetres per month. Within seven years, a four metre high island of silt formed on the seaward side of the causeway; and the effects were felt 20 kilometres downstream, where two metres of mud impaired navigation at Hantsport." [Harry Thurston, "Tidal Life: A Natural History of the Bay of Fundy". Camden House, 1990, p. 43.]
Researchers soon discovered that the mud flats had become a biological
desert , devoid of life, as the sediments were too soft to support organisms. The need to monitor and assess the impacts of such changes gave impetus to a greater interest inBay of Fundy ecosystem and the ultimate establishment of the Acadia Centre for Estuarine Research in Wolfville. [Harry Thurston, "Tidal Life: A Natural History of the Bay of Fundy". Camden House, 1990, p. 44]Recently announced plans for the expansion of Highway 101 between the
Halifax Regional Municipality and the eastern end of theAnnapolis Valley have raised concerns about maintaining the Avon River causeway. An environmental lobby group, Friends of the Avon River (FAR), has called for studies into the possibility of removing the causeway entirely and carrying the expressway and railway line on a new bridge, allowing the natural flow of the river course to be reestablished. FAR has also recently begun to oppose the expansion of gypsum quarries within the river's watershed because of threats to river life, citing the use de-watering runoff from the quarries. [ [http://www.avondalemedia.ca/APWPS/releases/far.php FAR Press Release] ]A decision in August 2007 by the
New Brunswick government to remove a similar causeway (constructed in 1968) blocking thePetitcodiac River , another tribuatary of the Bay of Fundy, to avoid facing charges under the federal "Fisheries Act", is expected to have ramnifications for the Avon River causeway.References
External links
* [http://www.gov.ns.ca/tran/publications/ACER75_Env%20Implications%20of%20Causeway%20Expansion.pdf 2004 study of environmental impacts of widening the causeway]
* [http://www.avondalemedia.ca/APWPS/pages/about.php Avon Peninsula Watershed Preservation Society]
* [http://ace.acadiau.ca/science/cer/index.htm Acadia Centre for Estuarine Research]
* Danika van Proosdij and Sarah M. Townsend, [http://docs.informatics.management.dal.ca/gsdl/collect/bofep1/pdf/WF/BOFEP6-2004-258.pdf "Sedimentation and Mechanisms of Salt Marsh Colonization on the Windsor Mudflats"] , in "The Changing Bay of Fundy—Beyond 400 Years", 2004
Wikimedia Foundation. 2010.