- Shinshōnan Bypass
Infobox_road
highway_name = Shinshōnan Bypass(新湘南バイパス)
marker_
length = 15.1 km
established = 1988 [cite web| url= http://www.dokokyo.or.jp/data/nenpyo/1988.htm | title= Construction History of Japan |author= Japan Civil Engineering Contractors' Association | accessdate= 2008-06-06 ] [cite web| url= http://www.ktr.mlit.go.jp/kawakoku/road/index.htm | title= 50 Years of Roads in Kanagawa Prefecture | author= Ministry of Land, Infrastructure and Transport, Kanto Bureau, Kawasaki Office | accessdate= 2008-06-06 ]
first_open =
starting_terminus =Fujisawa Interchange inFujisawa, Kanagawa
cities = Chigasaki, Hiratsuka
ending_terminus =Ōiso-higashi Interchange inŌiso, Kanagawa
The nihongo|Shinshōnan Bypass|新湘南バイパス|Shinshōnan Baipasu (lit. NewShōnan Bypass) is a 4-lanedtoll road inKanagawa Prefecture ,Japan . It is owned and managed byCentral Nippon Expressway Company .Overview
Officially the road is designated as a bypass for National Route 1. It is also classified as a road for nihongo|motor vehicles only|自動車専用道路|Jidōsha Senyō Dōro and access is controlled with interchanges and junctions in a similar manner to national expressways in Japan.
An existing section of the road is also planned to be incorporated into the route of the
Ken-Ō Expressway once adjoining sections of that expressway have been completed. [cite web| url= http://www.ktr.mlit.go.jp/3kanjo/kenoudo/kanagawa.htm | title= Ken-O Expressway in Kanagawa Prefecture | author= Ministry of Land, Infrastructure and Transport, Kanto Bureau | accessdate= 2008-06-06 ]The first section of the road (8.4 km from Fujisawa Interchange to
Chigasaki-nishi Interchange ) was opened to traffic in 1988. A second section (6.7 km from Chigasaki-nishi Interchange to Ōiso-higashi Interchange) is planned; 1.6 km of the second section was opened to traffic in 1995. Beyond the terminus in Ōiso the road is expected to connect directly to the eastern terminus of theSeishō Bypass .cite web| url= http://www.ktr.mlit.go.jp/yokohama/service_inf/business/e_02-01-01.htm | title= Shinshonan Bypass Informational Page | author= Ministry of Land, Infrastructure and Transport, Kanto Bureau, Yokohama Office | accessdate= 2008-06-06 ]The toll for a regular passenger car to traverse the entire road is 400
yen .Electronic Toll Collection (ETC) is accepted for payment, however no discount programs are in effect.List of interchanges and features
* IC - interchange, JCT - junction, TB -
toll gate References
External links
* [http://www.c-nexco.co.jp/english Central Nippon Expressway Company]
Wikimedia Foundation. 2010.