- Bundesautobahn 661
Infobox Bundesautobahn
NUMBER=661
TOTAL LENGTH KM=40
TOTAL LENGTH MI=25
BUNDESLAND=Hesse
LANES=2-3
JUNCTIONS=Table
type=class="wikitable"
hdrs=!!!!BAB intro|661 - also called "Osttangente Frankfurt" (easttangent Frankfurt) or "Taunusschnellweg" - is a 40 km (25 mi) long
Autobahn inGermany . It starts inOberursel and goes alongBad Homburg , Frankfurt am Main, Offenbach am Main andNeu-Isenburg until it is ending inEgelsbach .The todays A 661 were opened with section Bad Homburg (today junction 3) and Frankfurt-Bonames (formerly junction 5b). While continuation to Oberursel-Nord happens easy the construction to Frankfurt-Eckenheim get delayed very much. There was an interims end between Bonames and Eschersheim near the "Bonameser Platz". After many years the extension to the "Friedberger Landstraße" follows. The section between Offenbach and Egelsbach was also already constructed, but at this time as an part of the A 49 which was planned as an Autobahn between
Kassel andDarmstadt . After this plan had been stopped this section becomes an part of the A 661.The section between the two others had been finalized step-by-step and was closed in 1995.
At the newest section between the "Friedberger Landstraße" and "Frankfurt-Ost" (close to the Eissporthalle the lanes are very tight because of economy measures. There is no hard shoulder at the moment and the lanes are only separated by an one meter high concrete wall. From the planned section only the half had been built until 1995 because of the brigde which is needed at the "Bornheimer Hang", so the lanes in both directions are smaller in this section than in the others. When the section is completeted it is planned that there are three lanes like in the other sections and to built to more bridges. One bridge over the "Seckbacher Tal" (270 m) and one over the "Erlenbruch" (200 m). The construction has now already started in November 2007 and the plan is that the work is completed in 2009. By completing the A 661 also the bridges which are needed for the "Autobahndreieck Erlenbruch" (one double-deck bridges and the rampes).
Between Seckbach and Bornheim is an especial construction. The "Galerie Seckbacher Straße" which was built in 1995 has two functions. At first it is a bridge over the Autobahn for the "Seckbacher Landstraße" and the "Heinz-Herbert-Karry-Straße" and second it is an noise protection for the quarter "Seckbach" next to the Autobahn. On the top of the tunnel there was built a small park. In the construction it is possible to connect it to the Alleentunnel of the A 66.
At the end near
Egelsbach in the south it is also possible to expand the Autobahn. The drive-up and drive-downs to Darmstadt already had been asphalted but the plan to built the Autobahn until Darmstadt was stopped in 1980. At the northern end near Bad Homburg, the Autobahn is made to the Bundestraße 455, and this goes along Kronberg and Königsstein, while the Autobahn has ended there for over 20 years.There had been problems with the roadbed at the 15 July 2007 because of the heat at this day. Some concrete slabs move over others at A 661 near Dreieich (district Offenbach). The expansion joints had not been large enough to fit the concrete slabs when the get bigger because of the heat the police said. Several cars had been damaged. The point at the junction in direction Oberursel had to be closed and the cars had to take an parallel lane which was normally used for the other direction.
External links
*
* Informations about the completing of the A 661 at the sites of the [http://www.hsvv.hessen.de/internet/broker.jsp?uMen=5d330b20-06e6-9601-e76c-df2d6b51cdd0&_ic_uCon=52350dec-6218-9901-be59-26f2d6b51cdd| Hessische Straßen- und Verkehrsverwaltung]
Wikimedia Foundation. 2010.