Niederfinow boat lift

Niederfinow boat lift

Coordinates: 52°50′56″N 13°56′29″E / 52.84889°N 13.94139°E / 52.84889; 13.94139

Niederfinow boat lift

The Niederfinow boat lift is the oldest working boat lift in Germany. It lies on the Oder-Havel-Kanal near Niederfinow in Brandenburg. The lift overcomes a difference in elevation of 36 metres.

Contents

History

Aerial Photo
Picture from inside the lift structure

On 17 June 1914 the large navigation between Berlin and Stettin was opened. Near Niederfinow the difference in elevation was overcome using a staircase lock with four chambers. One can still visit the remains of these locks today (seen in the foreground of the accompanying aerial photograph).

The capacity of the staircase locks was quickly exceeded, therefore, between 1927 and 1934 the boat lift was built and inaugurated on 21 March 1934. The lift is 60 m high, the length 94 m, taking five minutes for the trough to move through the 36m elevation difference. The following enterprises were involved:

Foundations

  • Beton- und Monierbau AG, Berlin
  • Chistoph & Unmack GmbH, Berlin
  • Philipp Holzmann AG, Berlin

Steel structure

  • August Klönne, Dortmund
  • J. Gollnow & Sohn, Stettin
  • Gutehoffnungshütte AG, Oberhausen
  • Mitteldeutsche Stahlwerke AG, Lauchhammer

Machinery

  • Demag AG, Duisburg
  • Ardeltwerke, Eberswalde
  • Fried. Krupp Grusonwerk, Magdeburg

Electrical system

  • Siemens-Schuckert werk, Berlin
  • Allgemeine Electrizitäts-Gesellschaft, Berlin

Foundations and steel structure of the aqueduct

  • Beuchelt & Co, Grünberg

By 26 January 1939 100,000 boats had already passed through the lift. In the inaugural year there was 2,832,000 tonnes of traffic.

The lift was the subject of a general overhaul in 1980 and the lifting cables were renewed in 1984/85.

Today the boat lift is too short some barge trains which must be separated to pass the lift. The lift is running near to its capacity with about 11,000 boats passing through each year[1], so in 1997 the decision was made to build a new, bigger lift.

The Niederfinow lift is a popular tourist destination with about 500,000 visitors per year.[1] Due to this a new larger car park was opened in 2003.

Technology

Information plaque
Steel construction of the upper aqueduct
The trough counterweights

The boat lift consists of 14,000 Tonnes of riveted structural steelwork standing on steel columns. The Oder-Havel-Kanal approaches the head of the lift on a 4,000 Tonne riveted steelwork aqueduct. The trough when filled weighs 4,290 tonnes and hangs on 256 steel cables, these cross over guide rollers and support 192 counterweights which balance the trough. The security of the lift is maintained by keeping half the cables in tension and the other half relaxed in reserve. The guide rollers have a diameter of 3.5m.

Pin gearing with D.C.motors in Leonards electric motor speed controllers, connected together by a shaft allow a symmetrical drive. This arrangement allows the exact synchronisation of the four pin gears. The four Leonard controllers each have an output of 55 kilowatts totalling 220 kilowatts. Four worm geared shafts are driven which intersect with internal threads built into the troughs. These move freely under normal circumstances but would seize if a cable broke providing extra safety.

Planning for the new boat lift

Because of the continuing increase in traffic on the Oder-Havel-Kanal, in 1997 it was decided that a new, bigger lift should be built. In the autumn of 2006 earthworks began between the lift and the old staircase locks. The new lift, which is being built by Bilfinger Berger[2] and the site is being developed in partnership with Johann Bunte[3], is due to be finished in 2014. The trough will be 112m long and 11.6m wide and weigh over 9000 Tonnes. The cost will be 285 million euros.[4] The old lift will remain in use however until at least 2025.

Further reading

  • Uhlemann, Hans-Joachim (2002). Canal lifts and inclines of the world (English Translation ed.). Internat. ISBN 0-9543-1811-0. 

References

  1. ^ a b Das Original, Berliner Zeitung, 16 October 2006 in German
  2. ^ German Ship Lift Rebuilt as Stimulus Floods Waterways
  3. ^ [1]
  4. ^ The largest building site in East Brandenburg begins at Niederfinow, FORUM Online, 8. März 2007 German Article

External links


Wikimedia Foundation. 2010.

Игры ⚽ Поможем решить контрольную работу

Look at other dictionaries:

  • Boat lift — A boat lift, ship lift, or lift lock is a machine for transporting boats between water at two different elevations, and is an alternative to the canal lock and the canal inclined plane.It may be either vertically moving, like the ship lifts in… …   Wikipedia

  • List of boat lifts — Strépy Thieu boat lift This list includes all types of constructions to lift or lower boats between two levels of a waterway, such as boat lifts, canal inclined planes, portage railways and water slopes, but excluding conventional locks. This… …   Wikipedia

  • Список судоподъёмников по странам — Самый большой в мире вертикальный судоподъёмник Стрепи Тьё Это неполный список гидротехнических сооружений, предназначенны …   Википедия

  • Liste des ascenseurs à bateaux — Ascenseur funiculaire de Strépy Thieu …   Wikipédia en Français

  • canals and inland waterways — ▪ waterway Introduction       natural or artificial waterways used for navigation, crop irrigation, water supply, or drainage.       Despite modern technological advances in air and ground transportation, inland waterways continue to fill a vital …   Universalium

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”